06.06.2013 Views

2 - ALU-WEB.DE

2 - ALU-WEB.DE

2 - ALU-WEB.DE

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APT <strong>ALU</strong>MINIUM NEWS 4 | 12-2009<br />

Hydro divests automotive structures activities<br />

Norsk Hydro ASA will sell<br />

its automotive structures<br />

business to Benteler Automobiltechnik<br />

GmbH, the<br />

automotive division of the<br />

large German industrial<br />

enterprise Benteler Group<br />

with headquarters in Paderborn.<br />

The agreement is in line<br />

with Hydro’s strategy to focus<br />

its extruded activities on profiles<br />

solutions and building<br />

systems.<br />

The transaction is<br />

expected to be cash neutral for<br />

Hydro, and an estimated after<br />

tax loss of NOK250 million<br />

will be recognized in Hydro’s<br />

fourth quarter 2009 results.<br />

Hydro expects the transaction<br />

to close by the end of the<br />

fourth quarter 2009 subject<br />

to clearance by relevant competition<br />

authorities and other<br />

anti-trust bodies.<br />

”We are pleased to have<br />

found a buyer with the ambition,<br />

competence and size<br />

to further develop the auto-<br />

Solios Carbone<br />

contract for Hindalco<br />

Fives Solios green anode plant<br />

In August 2009, Solios Carbone<br />

has been awarded a<br />

global order by Hindalco<br />

for its two new smelters to<br />

be built in India. The capacity<br />

of both greenfield smelters<br />

will be of 360,000 tpy of<br />

aluminium. Each one will<br />

consist in one line of 360<br />

pots based on AP36 technology<br />

operating at 360 kA.<br />

The contract consists of a<br />

turnkey 35 tph green anode<br />

plant for the Mahan project<br />

located in Madhya Pradesh<br />

State and a turnkey 52 tph<br />

green anode plant for the<br />

Aditya project located in<br />

Orissa State. EIL is the engineering<br />

company assisting<br />

Hindalco in the execution of<br />

those projects.<br />

Both green anode plant<br />

will be equipped with Solios<br />

Carbone’s latest technologies<br />

such as Rhodax for dry<br />

material preparation, IMC<br />

for paste preparation, mixing<br />

and cooling, and Xelios, the<br />

latest generation of vibrocompacting<br />

machine for anode<br />

forming. The Aditya green<br />

anode plant will be similar to<br />

the one that Solios Carbone<br />

is presently commissioning<br />

at Qatalum in Qatar.<br />

These contracts will be<br />

implemented by a consortium<br />

led by Solios Carbone<br />

with Fives India and McNally<br />

Hydro President and CEO Svein Richard Brandtzæg (left)<br />

congratulates Hubertus Benteler of the Benteler Group<br />

Bharat Engineering (MBE)<br />

for detail engineering, fabrication,<br />

construction, erection<br />

and civil works. Fives India,<br />

the manufacturing subsidiary<br />

of the Fives group, will<br />

be responsible for the local<br />

procurement of certain key<br />

equipment and the integration<br />

of the related engineering<br />

data into 3D models.<br />

Turnkey supply of gas<br />

treatment centres<br />

for Balco smelter<br />

expansion<br />

Solios Environment SA<br />

has been awarded a contract<br />

by Vedanta for their Balco<br />

expansion project located in<br />

Korba , India. The production<br />

capacity of this smelter<br />

expansion will be of 750,000<br />

tpy of aluminium with two<br />

lines of 336 electrolysis pots<br />

(one new line and one revamping<br />

of a Soderberg line), based<br />

on GAMI technology operating<br />

at 365 kA. The contract<br />

consists of the turnkey supply<br />

of four gas treatment centres,<br />

each fitted with 18 TGT-RI filters<br />

and four exhaust fans to<br />

treat gases coming from the<br />

pots. It includes two large concrete<br />

alumina storage silos of<br />

3,000 tonnes and two concrete<br />

stacks of 80 metres high.<br />

www.fivesgroup.com<br />

Photo: Fives Solios<br />

Photo: Hydro<br />

motive structures activities,”<br />

says Executive Vice President<br />

Johnny Undeli, responsible<br />

for the Extruded Products<br />

business area in Hydro.<br />

Hydro’s automotive structures<br />

business, part of the<br />

Extruded Products business<br />

area, is a leading supplier of<br />

advanced crash management<br />

systems, roll-over bar protection<br />

systems and other structural<br />

components and assemblies,<br />

serving the majority of<br />

the global carmakers.<br />

The business has a significant<br />

part of its production<br />

at Raufoss in Norway, with<br />

other plants in China, Czech,<br />

Denmark, France, Germany,<br />

Sweden and the United States.<br />

Partner for the<br />

aluminium -industry<br />

extruder dies hardening Processing service<br />

NEWS<br />

With 14 Locations within Europe, the HAARMANN-GROUP is a reliable<br />

partner in many branches of industry. In co-operation with our customers<br />

we are constantly providing new solutions and in so-doing, optimizing<br />

a diversity of manufacturing processes.<br />

Haarmann Holding GmbH<br />

Karmeliterstraße 6<br />

D - 52064 Aachen<br />

E-Mail info@haarmann-gruppe.de<br />

Revenues amounted to NOK<br />

2.2 billion in 2008 and the<br />

business had about 1,200<br />

employees at the end of the<br />

third quarter 2009.<br />

The Benteler Group is<br />

internationally active with its<br />

business divisions Automotive,<br />

Steel/Tube and Distribution<br />

and was founded in 1876.<br />

Operating under the Benteler<br />

name, the business is not only<br />

one of the largest independent<br />

automotive suppliers, but<br />

also one of the most important<br />

steel tube manufacturers<br />

in Europe as well as one of<br />

the leading stock holders and<br />

processors of steel tubes and<br />

stainless steel tubes. Today,<br />

Benteler employs more than<br />

HAARMANN-GROUP<br />

The thus improved qualities contribute<br />

decisively to our customer<br />

success.<br />

Phone +49 241 91850-0<br />

Telefax +49 241 91850-10<br />

www.haarmann-gruppe.de<br />

www.haertha.de<br />

3<br />

24,000 persons at 150 locations<br />

in 35 countries.<br />

”We’ve restructured and<br />

reduced the size of our automotive<br />

structures activities<br />

over the past years. This has<br />

improved financial results,<br />

despite the economic downturn,”<br />

says Undeli. “ After<br />

having run these operations<br />

for a number of years without<br />

satisfactory earnings, we feel<br />

convinced that the new owner<br />

will concentrate fully on serving<br />

the automotive industry<br />

and that it will add the competence<br />

necessary to increase<br />

profitability and market position.”<br />

www.hydro.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!