6.2.13 Go to Over view<br />

6.2.14 Click Start to start the process.<br />

The system is going to pump down the chamber, deposit the requested film than vent the<br />

chamber automatically<br />

Warning: Do not use Auto Regen in any case<br />

6.3 Deposition Completion<br />

The process completion will be notified by a string of beeping sound and<br />

the “Auto Process End OK” flashing alarm. It is safe to open the chamber<br />

door and remove the sample.<br />

6.4 Chamber Pump down<br />

6.4.1 Close and lock the chamber door with the hook<br />

6.4.2 Click the RECIPE icon to open RECIPE SCREEN<br />

6.4.3 Click EDIT/ CREATE under MASTER RECIPE to open Master<br />

Recipe Builder window<br />

6.4.4 Click Auto Pump under Sequence Type to pull down the list of<br />

sequence<br />

6.4.5 Click the Auto Pump to high light it<br />

6.4.6 Add APump.dat to the Master Sequence List by click on ADD icon<br />

6.4.7 Load the Auto Pump sequence to Master Recipe by clicking on<br />

DOWNLOAD then save the recipe by the name A_Pump1<br />

6.4.8 Close the Master Recipe Builder window by clicking CLOSE<br />

6.4.9 Click the OVERVIEW icon to enter the main controller window.<br />

6.4.10 Start to pumping down the chamber by clicking the START<br />

6.4.11 Complete filling in the log book. Enter any thickness data if<br />

available. Note any problems under comments.<br />