15.07.2013 Views

Software Project Management Plan (SPMP) - Southern Polytechnic ...

Software Project Management Plan (SPMP) - Southern Polytechnic ...

Software Project Management Plan (SPMP) - Southern Polytechnic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.3. Document Overview<br />

This plan is organized as follows:<br />

Page 19 of 60<br />

Test <strong>Management</strong> Tool (TMT)<br />

<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />

TMT-<strong>SPMP</strong>-1.2<br />

27-Sep-2010<br />

1. Section 1: <strong>Project</strong> Overview. This section provides an overview of the scope and<br />

objectives of the project, project's assumptions and constraints, deliverables, schedule and<br />

budget, and evolution of the plan.<br />

2. Section 2: References. This section provides a list of documents, standards, policies,<br />

templates, processes, and other material referenced within this plan.<br />

3. Section 3: Definitions. This section contains the abbreviations, acronyms, and definitions<br />

of terminologies used within the plan.<br />

4. Section 4: <strong>Project</strong> Organization. This section identifies interfaces to organizational<br />

entities external to the project, describes the project's internal organization structure, and<br />

defines roles and responsibilities for the project.<br />

5. Section 5: <strong>Management</strong> Process. This section specifies the project management processes<br />

for the project; i.e., planning, measurement, tracking, reporting, risk control mechanisms,<br />

and project initiation and closeout procedures.<br />

6. Section 6: Technical Process. This section specifies the development process model, the<br />

technical methods, tools, and techniques to be used to develop the various work products,<br />

plans for establishing and maintaining the project infrastructure, and the product<br />

acceptance.<br />

7. Section 7: Supporting Process. This section contains plans for supporting processes that<br />

span the duration of the software project; including, but not limited to, configuration<br />

management, verification and validation, documentation, quality assurance, reviews and<br />

audits, problem resolution, and process improvement.<br />

8. Section 8: Addition <strong>Plan</strong>s. This section contains additional plans required to satisfy<br />

product requirements, safety requirements, privacy and security requirements, as well as<br />

any other plans.<br />

9. Appendixes. This section contains addition material that helps the understanding of this<br />

plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!