Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1.3. Document Overview<br />
This plan is organized as follows:<br />
Page 19 of 60<br />
Test <strong>Management</strong> Tool (TMT)<br />
<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />
TMT-<strong>SPMP</strong>-1.2<br />
27-Sep-2010<br />
1. Section 1: <strong>Project</strong> Overview. This section provides an overview of the scope and<br />
objectives of the project, project's assumptions and constraints, deliverables, schedule and<br />
budget, and evolution of the plan.<br />
2. Section 2: References. This section provides a list of documents, standards, policies,<br />
templates, processes, and other material referenced within this plan.<br />
3. Section 3: Definitions. This section contains the abbreviations, acronyms, and definitions<br />
of terminologies used within the plan.<br />
4. Section 4: <strong>Project</strong> Organization. This section identifies interfaces to organizational<br />
entities external to the project, describes the project's internal organization structure, and<br />
defines roles and responsibilities for the project.<br />
5. Section 5: <strong>Management</strong> Process. This section specifies the project management processes<br />
for the project; i.e., planning, measurement, tracking, reporting, risk control mechanisms,<br />
and project initiation and closeout procedures.<br />
6. Section 6: Technical Process. This section specifies the development process model, the<br />
technical methods, tools, and techniques to be used to develop the various work products,<br />
plans for establishing and maintaining the project infrastructure, and the product<br />
acceptance.<br />
7. Section 7: Supporting Process. This section contains plans for supporting processes that<br />
span the duration of the software project; including, but not limited to, configuration<br />
management, verification and validation, documentation, quality assurance, reviews and<br />
audits, problem resolution, and process improvement.<br />
8. Section 8: Addition <strong>Plan</strong>s. This section contains additional plans required to satisfy<br />
product requirements, safety requirements, privacy and security requirements, as well as<br />
any other plans.<br />
9. Appendixes. This section contains addition material that helps the understanding of this<br />
plan.