Page 43 of 60<br />

Test <strong>Management</strong> Tool (TMT)<br />

<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />

TMT-<strong>SPMP</strong>-1.2<br />

27-Sep-2010<br />

In a Peer Review, when the author completes a work product he/she notifies the project manager<br />

to initiate peer review. The project manager assures that the work product is in configuration,<br />

properly versioned, and ready for review and then initiates the review by assigning various<br />

reviewing activities to different technical expertise. Each reviewer reviews the assigned part of<br />

the work product to find defects and records them. Once completing the assigned review, each<br />

reviewer submits findings/defects to the author of the work product. The author updates the work<br />

product based on the findings submitted, if applicable. The project manager moderates the entire<br />

review process to assure all finding being updated properly and then closes out the review.<br />

Author<br />

Notifies<br />

Completes<br />

Updates<br />

<strong>Project</strong> Manager<br />

Work Product<br />

Find defects<br />

Initiates review<br />

Moderates & closes review<br />

Figure 7.4-2: Walkthrough Review Process<br />

Reviewers<br />

The process of a Walkthrough Review is similar to the Peer Review, except that all participants;<br />

i.e., project manager, author, and reviewers, are gathering in a meeting and walk through the<br />

work product to find defects and correct them as applicable. This type of review is more<br />

expensive but it produces more product quality.<br />

Appendix A is the checklist for requirements review.<br />

Appendix B is the checklist for design review.<br />

Appendix C is the check list for code review.<br />

Appendix D is the checklist for test procedure/script review.<br />

Appendix E is the template for how to record a defect.<br />

Appendix F is the template for how to plan and kick off a review.<br />

Appendix G is the template for how to close out a review.<br />

Appendix H is the template for how to resolve a finding.<br />

7.5. Reviews and Audits<br />

The following is a listing of all work products and corresponding review types::<br />

Product Type Work Product Type of Review Purpose<br />

Documentation <strong>SPMP</strong> Peer Review To agree and follow the plans