5.1. Start-up <strong>Plan</strong><br />
5.1.1. Estimation <strong>Plan</strong><br />
5. MANAGERIAL PROCESS PLANS<br />
Page 29 of 60<br />
Test <strong>Management</strong> Tool (TMT)<br />
<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />
TMT-<strong>SPMP</strong>-1.2<br />
27-Sep-2010<br />
The TMT project estimation is based on the detailed work break structure defined in the TMT<br />
Team’s Metric Program (i.e., in MS Excel). The TMT PM defines the high-level tasks based on<br />
the project scope and high-level requirements and then coordinates with the team leads (i.e.,<br />
Requirements Lead, Design Lead, Development Lead, and Test Lead) to further break each highlevel<br />
task down to lower-level tasks. Each low-level task will be defined, assigned, and estimated<br />
as follows:<br />
Task Name:<br />
The project management tasks are defined to develop the development plans and<br />
run the team, including team meetings, status reports, coordination, and team<br />
support. These tasks are mostly assigned to the project team manager.<br />
The test management tool tasks are defined to develop the product that is broken<br />
off into different product features. The project team manager provides the initial<br />
task effort estimation and then assigns to team members based on their skill sets;<br />
i.e., requirements, design, coding, testing, and documentation. On Monday of<br />
each week, all team members get together and re-assess initial effort estimation to<br />
provide more accurate effort estimation based on the previous actual efforts.<br />
The support tasks are defined to do miscellaneous product supports and<br />
maintenance during testing and customer demos.<br />
For each task, the project team manager provides planned task information (i.e., start<br />
date, finish date, duration, effort, and cost); the responsible team members record the<br />
actual information.<br />
Start Date: The date when the work begins.<br />
Finish Date: The date when the work finishes.<br />
Duration: The total number of days the work takes place.<br />
Effort: The total hours it takes to finish the work.<br />
Cost: The total of cost in dollar to complete the work.<br />
Resource: The responsible team member (s) to work the task.<br />
5.1.2. Staffing <strong>Plan</strong><br />
The project team consists of 5 graduate students pre-assigned to the team to complete the STS<br />
architectural framework and the TMT tool. The following table summarizes the skill levels of all<br />
team members: