15.07.2013 Views

Software Project Management Plan (SPMP) - Southern Polytechnic ...

Software Project Management Plan (SPMP) - Southern Polytechnic ...

Software Project Management Plan (SPMP) - Southern Polytechnic ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 35 of 60<br />

Test <strong>Management</strong> Tool (TMT)<br />

<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />

TMT-<strong>SPMP</strong>-1.2<br />

27-Sep-2010<br />

Name Email Phone Comment<br />

Jagati Vempaty jvempaty@spsu.edu 404-751-7896 N/A.<br />

Seth Zaah sethzaah@yahoo.co.uk 678-485-8014 Work at Client Support/Real<br />

Estate, 9:00 AM - 7:00 PM,<br />

Mon - Sat.<br />

Tom Le tomle75@comcast.net 404-791-3816 Work at LM Aero Mon – Fri,<br />

9:00 – 3:00.<br />

5.3.6. Metrics Collection <strong>Plan</strong><br />

The TMT Team’s metric program follows the Goal-Question-Measurement (GQM) approach to<br />

establish team’s goals, define goal-oriented questions, and determine measurements for the<br />

defined goals and questions. The following table shows various metrics the TMT Team needs to<br />

collect and report:<br />

Table 5.3-2: TMT Metrics<br />

Metric Category Metric Name Purpose<br />

Cost per Unit To project future cost estimation.<br />

MTBF To collect the mean time between failures to<br />

project product availability.<br />

Product Metrics Product Size To provide future effort estimation.<br />

Performance To provide product performance assessment<br />

since it is an online service.<br />

Quality Level To assess the product quality level.<br />

Phase-based Effort To assess the effort by various development<br />

phases (i.e., requirements, design, code,<br />

test, and documentation).<br />

EDR per Phase To assess the effectiveness of defect<br />

removal per phase.<br />

Process Metrics Response Time of Fix To assess responses to fixes, future effort<br />

estimations, and early risk mitigations.<br />

Fix Backlog To assess future workloads and schedule<br />

risks.<br />

Fix Quality To assess rework.<br />

Defect Density To assess defects per product size.<br />

Schedule To identify root causes for schedule slippage<br />

and work under-estimates.<br />

<strong>Project</strong> Metrics Cost To identify cost variance and task allocation.<br />

Productivity To assess productivity and task reallocation.<br />

Scope To identify changes to project scope.<br />

***NOTE: The detailed GQM metric program is defined in a separate MS Excel file and posted<br />

on the TMT website at http://www.cse.spsu.edu/ftsui/SWE7903.html.<br />

5.4. Risk <strong>Management</strong> <strong>Plan</strong><br />

To ensure all milestones and work packages delivered on-time, within budget, at product quality,<br />

the TMT Team’s strategy is to follow the steps below:

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!