Page 35 of 60<br />
Test <strong>Management</strong> Tool (TMT)<br />
<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />
TMT-<strong>SPMP</strong>-1.2<br />
27-Sep-2010<br />
Name Email Phone Comment<br />
Jagati Vempaty jvempaty@spsu.edu 404-751-7896 N/A.<br />
Seth Zaah sethzaah@yahoo.co.uk 678-485-8014 Work at Client Support/Real<br />
Estate, 9:00 AM - 7:00 PM,<br />
Mon - Sat.<br />
Tom Le tomle75@comcast.net 404-791-3816 Work at LM Aero Mon – Fri,<br />
9:00 – 3:00.<br />
5.3.6. Metrics Collection <strong>Plan</strong><br />
The TMT Team’s metric program follows the Goal-Question-Measurement (GQM) approach to<br />
establish team’s goals, define goal-oriented questions, and determine measurements for the<br />
defined goals and questions. The following table shows various metrics the TMT Team needs to<br />
collect and report:<br />
Table 5.3-2: TMT Metrics<br />
Metric Category Metric Name Purpose<br />
Cost per Unit To project future cost estimation.<br />
MTBF To collect the mean time between failures to<br />
project product availability.<br />
Product Metrics Product Size To provide future effort estimation.<br />
Performance To provide product performance assessment<br />
since it is an online service.<br />
Quality Level To assess the product quality level.<br />
Phase-based Effort To assess the effort by various development<br />
phases (i.e., requirements, design, code,<br />
test, and documentation).<br />
EDR per Phase To assess the effectiveness of defect<br />
removal per phase.<br />
Process Metrics Response Time of Fix To assess responses to fixes, future effort<br />
estimations, and early risk mitigations.<br />
Fix Backlog To assess future workloads and schedule<br />
risks.<br />
Fix Quality To assess rework.<br />
Defect Density To assess defects per product size.<br />
Schedule To identify root causes for schedule slippage<br />
and work under-estimates.<br />
<strong>Project</strong> Metrics Cost To identify cost variance and task allocation.<br />
Productivity To assess productivity and task reallocation.<br />
Scope To identify changes to project scope.<br />
***NOTE: The detailed GQM metric program is defined in a separate MS Excel file and posted<br />
on the TMT website at http://www.cse.spsu.edu/ftsui/SWE7903.html.<br />
5.4. Risk <strong>Management</strong> <strong>Plan</strong><br />
To ensure all milestones and work packages delivered on-time, within budget, at product quality,<br />
the TMT Team’s strategy is to follow the steps below: