Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
7. SUPPORTING PROCESS PLANS<br />
7.1. Configuration <strong>Management</strong> <strong>Plan</strong><br />
Page 41 of 60<br />
Test <strong>Management</strong> Tool (TMT)<br />
<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />
TMT-<strong>SPMP</strong>-1.2<br />
27-Sep-2010<br />
All software artifacts generated by the TMT Team need to be uploaded to the Team’s website at<br />
http://cse.spsu.edu/ftsui/SWE7903.html and at ftp.tqllearning.com. Due to decentralized work<br />
locations of all team members, a remote configuration management is required. The TMT Team<br />
uses http://adam404.unfuddle.com/svn/adam404_capstone/ to share and control versions of all<br />
software product artifacts. The following figure depicts the process of configuration<br />
management:<br />
Figure 7.1-1: TMT Configuration <strong>Management</strong> Flow<br />
7.2. Verification and Validation <strong>Plan</strong><br />
There is no independent verification and validation organization needed for this project. All<br />
verifications and validations are done through peer reviews and walkthroughs. The TMT <strong>Project</strong><br />
Advisor plays an important role in verifying and validating the TMT's developmental plans,<br />
processes, schedules, deliverables, and quality of the product before the IAB presentation and<br />
demo. To assure the time for the TMT <strong>Project</strong> Advisor completing his verification and<br />
validation, the TMT Team provides incremental submissions of project statuses, demos, and<br />
deliverables on the weekly basis as a minimum.