Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
Software Project Management Plan (SPMP) - Southern Polytechnic ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Table 6.2-1: TMT Programming Languages<br />
Page 39 of 60<br />
Test <strong>Management</strong> Tool (TMT)<br />
<strong>Software</strong> <strong>Project</strong> <strong>Management</strong> <strong>Plan</strong> (<strong>SPMP</strong>)<br />
TMT-<strong>SPMP</strong>-1.2<br />
27-Sep-2010<br />
Language Version Description<br />
C# 4.0 Used to implement business rules and data access logics.<br />
ASP.NET 4.0 Used to implement web-based user interfaces.<br />
T-SQL 2008 Used to implement database stored procedures, functions,<br />
and database queries.<br />
HTML 4.0 Used in parallel with ASP.NET to implement web pages.<br />
CSS 2.0 Used to control user interface looks and feel.<br />
JavaScript 1.1 Used to implement client-side codes.<br />
Silverlight 2.0 Used to improve the user interface.<br />
6.2.5. Tools<br />
The TMT Team uses the following tools for the development and testing of the STS overall<br />
framework and the TMT tool:<br />
Tool Version Description<br />
MS Visual Studio 2010 Pro An Integrated Development Environment (IDE) used for<br />
development and software builds.<br />
MS SQL Server 2008 Pro A RDBM system used to develop and test the database<br />
scripts, stored procedures, and user-defined functions.<br />
Microsoft Office 2007 Pro i.e., Word, Excel, Visio, Power Point, and Outlook used for<br />
documents, metrics, designs, presentations, and<br />
communication respectively.<br />
MS IE Browser 7.0 Used to test the system.<br />
MS Firefox 8.0 Used to test the system.<br />
<strong>Project</strong> Manager 2010 An online tool used to manage the work activities.<br />
6.3. Infrastructure <strong>Plan</strong><br />
There is no plan for the project infrastructure. The TMT Team makes use of the SPSU facilities<br />
and home offices. The TMT Team uses an online service at http:///www.winhost.com for testing<br />
environment.<br />
6.4. Product Acceptance <strong>Plan</strong><br />
There is no plan for the product acceptance; however, the work products generated need to agree<br />
to the planned deliverables and project basic requirements. The TMT <strong>Project</strong> Advisor has the<br />
opportunities to incrementally evaluate the product features on a weekly basis. Changes in scope<br />
can be negotiated and documented.