17.5.2 A bid determined as substantially non-responsive will be rejected by the OWNER <strong>and</strong> may<br />

not subsequently be allowed by the OWNER to be made responsive by the bidder by<br />

correction <strong>of</strong> the non-conformity.<br />

17.5.3 Bidder’s Bid shall be considered non-responsive <strong>and</strong> rejected, if deviations are taken to the<br />

under mentioned provisions <strong>of</strong> Bid Documents by the Bidder:-<br />

7<br />

i. Bid Security as per Article 9, Section 2.<br />

ii. Performance Security (CONTRACT Performance Bank Guarantee) for less than 10%<br />

<strong>of</strong> Contract/Order value.<br />

iii. Period <strong>of</strong> validity <strong>of</strong> bids as per Article 10 Section 2.<br />

iv. Force Majeure as per Section 3<br />

v. Resolution <strong>of</strong> Dispute/Arbitration as per Section-3<br />

vi. Completion period.<br />

vii. Termination <strong>of</strong> Contract (Provision as per Section-3)<br />

viii. Any other such provisions if specifically stipulated elsewhere in the Bid Document.<br />

17.5.4 Bids not conforming to Scope <strong>of</strong> Work as mentioned in Bid Document will be rejected.<br />

17.5.6 Conditional Bids will be liable for rejection.<br />

18.0 ARTICLE - 18: OPENING OF PRICE BIDS<br />

The price bids <strong>of</strong> the substantially responsive bidders will be opened later. The price bids <strong>of</strong><br />

those bidders determined to be not substantially responsive will be rejected.<br />

19.0 ARTICLE - 19: COMPARISON OF BIDS<br />

19.1 The OWNER will evaluate <strong>and</strong> compare bids previously determined to be substantially<br />

responsive.<br />

19.2 Arithmetical errors will be rectified on the following basis:-<br />

If there is a discrepancy between the unit price <strong>and</strong> the total price that is obtained by<br />

multiplying the unit price <strong>and</strong> quantity, the unit price shall prevail <strong>and</strong> the total price will be<br />

corrected. If there is a discrepancy between the total amount <strong>and</strong> the sum <strong>of</strong> total prices, the<br />

sum <strong>of</strong> the total prices shall prevail <strong>and</strong> the total bid amount will be corrected.<br />

19.3 OWNER’s evaluation <strong>and</strong> comparison <strong>of</strong> prices <strong>of</strong> previously determined substantially<br />

responsive bids shall take following in account:<br />

The evaluated price <strong>of</strong> bidders shall include the:<br />

i) Total contract price as per the Schedule <strong>of</strong> Rates (SOR).<br />

19.3.1 Comparison <strong>of</strong> Bids will be on the basis <strong>of</strong> overall lowest cost to <strong>GAIL</strong> as detailed in the<br />

Scope <strong>of</strong> Work.