04.08.2013 Views

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Noida (NCR<br />

locations), Pata<br />

<strong>and</strong> Vijaipur<br />

Ranchi, Usar,<br />

Ujjain, Vaghodia,<br />

Vijayawada <strong>and</strong><br />

Vizag<br />

0 to 1% 0 to 2% 0 to 3% Zero<br />

1 to 3 % 2 to 4 % 3 to 5 % 2<br />

3 to 5 % 4 to 6 % 5 to 8 % 3<br />

Above 5 % Above 6 % Above 8 % 5<br />

Formula for deduction for downtime<br />

Downtime in a quarter = A hours<br />

Downtime percentage = (A x 100) / (24x90) = B<br />

PCs & Peripherals<br />

Deduction factor according to the table= D<br />

Unit cost <strong>of</strong> equipment (as per SOR) = Q Rupees<br />

Amount <strong>of</strong> deduction = (Q x B x D)/100 Rupees<br />

Note<br />

If the uptime for equipment/system falls below 95% for more than 2 times<br />

(within 3 months), <strong>GAIL</strong> has the right to ask for the replacement for the same<br />

by the Vendor/Bidder, without any extra charge.<br />

The penalty shall be deducted from CPBG at the end <strong>of</strong> the warranty period.<br />

These items supplied in this order may be transferred to other <strong>GAIL</strong> locations<br />

in future as per the requirement. The Onsite Comprehensive Warranty shall<br />

be extended at the new locations also.<br />

All services, work, <strong>and</strong> deliverables will be performed by qualified personnel in<br />

a pr<strong>of</strong>essional <strong>and</strong> workman like manner, in accordance with the level <strong>of</strong><br />

industry st<strong>and</strong>ards in addition the Contractor warrants that<br />

• Performance <strong>of</strong> work will not violate any law, rule or regulation <strong>and</strong><br />

Contactor will acquire all required permits <strong>and</strong> licenses<br />

During the warranty period the bidder shall arrange for transport / packing / courier<br />

for any equipment in case <strong>of</strong> any equipment is required to be taken to bidder’s /<br />

OEM’s <strong>of</strong>fice/factory. The bidder shall also ensure for operational replacement <strong>of</strong><br />

the equipment in case <strong>of</strong> repair time being more than 2 days.<br />

COMPREHENSIVE WARRANTY<br />

All the items supplied to <strong>GAIL</strong> shall be covered under Comprehensive Onsite<br />

Warranty for a period <strong>of</strong> three years.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!