04.08.2013 Views

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16. Transit Risk<br />

Insurance<br />

CONSULTANT.<br />

General Conditions <strong>of</strong> Contract (Goods)<br />

15.5 In the event <strong>of</strong> delay in delivery, Price Reduction<br />

Schedule as stipulated in Article – 26 shall apply.<br />

15.6 The documentation, in English Language, shall be<br />

delivered in due time, in proper form <strong>and</strong> in the required<br />

number <strong>of</strong> copies as specified in the contract.<br />

15.7 The additional copies <strong>of</strong> final drawings <strong>and</strong> instructions<br />

will be included in the package <strong>of</strong> goods, properly<br />

enveloped <strong>and</strong> protected.<br />

15.8 The SELLER should comply with the Packing, Marking<br />

<strong>and</strong> Shipping Documentation Specifications enclosed.<br />

16.1 All goods supplied under the contract shall be fully<br />

insured in a freely convertible currency against loss or<br />

damage incidental to manufacture or acquisition,<br />

transportation, storage <strong>and</strong> delivery.<br />

16.2 Where delivery is on FOB or CFR basis, marine<br />

insurance shall be the responsibility <strong>of</strong> the Purchaser.<br />

Insurance Requirements :<br />

Indigenous Bidders : Transit risk insurance from<br />

F.O.T. despatch point onwards<br />

shall be arranged <strong>and</strong> borne by<br />

<strong>GAIL</strong>.<br />

Foreign Bidders : Marine insurance as well as<br />

transit insurance in Purchaser’s<br />

country shall be arranged <strong>and</strong><br />

borne by <strong>GAIL</strong>.<br />

The SELLER shall ensure that in effecting despatch <strong>of</strong><br />

materials, the primary responsibility <strong>of</strong> the carriers for<br />

safe movement is always retained so that the<br />

PURCHASER’s interests are fully safeguarded <strong>and</strong> are<br />

in no way jeopardised. The Seller shall furnish the cost<br />

<strong>of</strong> materials against each equipment.<br />

16.2 PURCHASER’s Insurance Agent :<br />

[The name <strong>and</strong> address-as mentioned under SCC]<br />

17. Transportation 17.1 Where the SELLER is required under the CONTRACT<br />

to deliver the GOODS FOB, transport <strong>of</strong> the GOODS<br />

until delivery, that is, upto <strong>and</strong> including the point <strong>of</strong><br />

putting the GOODS on board the export conveyance at<br />

the specified port <strong>of</strong> loading, shall be arranged <strong>and</strong> paid<br />

for by the SELLER <strong>and</strong> the cost there<strong>of</strong> shall be<br />

included in the Contract price.<br />

Rev.0: May’04 11<br />

17.2 Where the SELLER is required under the CONTRACT<br />

to deliver the GOODS CFR or CIF, transport <strong>of</strong> the<br />

Goods to the port <strong>of</strong> discharge or such other point in the<br />

country <strong>of</strong> destination as shall be specified in the<br />

CONTRACT shall be arranged <strong>and</strong> paid for by the

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!