equipment <strong>and</strong> the cabin no. At the end <strong>of</strong> the project, before signing <strong>of</strong> the<br />
acceptance Protocol, the site wise consolidated report mentioning the serial<br />
numbers <strong>and</strong> the employee name needs to be submitted to EIC in the form <strong>of</strong><br />
hardcopy <strong>and</strong> s<strong>of</strong>tcopy.<br />
9.0 ACCEPTANCE TESTS (AT)<br />
On Site Acceptance Test (OSAT)<br />
OSAT shall comprise <strong>of</strong> completion <strong>of</strong> following activities Site:<br />
1. Checking <strong>of</strong> the Configuration as per the technical specifications.<br />
2. Running & printing the diagnostic tests for SYSTEM (S) to check for the<br />
specifications<br />
3. Functional / Physical check <strong>of</strong> the Accessories supplied<br />
4. The required backup time <strong>of</strong> UPS on full load to be demonstrated to <strong>GAIL</strong><br />
5. Complete functionality <strong>of</strong> the system shall be tested as per Scope <strong>of</strong> Work<br />
& Technical Specifications<br />
All the necessary latest security patches are to be pre-loaded on the Desktops &<br />
other applications packages (Like MS Office) before <strong>installation</strong> at sites as<br />
mentioned in the Scope <strong>of</strong> Work.<br />
10.0 GUARANTEES, WARRANTEES & MAINTENANCE<br />
Downtime calculation for IT Equipment<br />
Vendor/Bidder shall be responsible for running each individual item at the<br />
uptime <strong>of</strong> 99% per quarter. The deduction for downtime will be as mentioned<br />
below. The downtime will be calculated on hourly basis per quarter on 24 hours<br />
basis for all items individually supplied in the order.<br />
Identified locations wherein the IT assets are to be delivered <strong>and</strong> the<br />
deduction down time shall be as follows<br />
Ahmedabad,<br />
Bangalore, Baroda,<br />
Bhubaneswar,<br />
Bhopal,<br />
Ch<strong>and</strong>igarh,<br />
Chennai, Delhi,<br />
Hyderabad, Jaipur,<br />
Kolkatta,<br />
Lucknow, Mumbai,<br />
DOWNTIME (Region-wise)<br />
Abu Road, Agra,<br />
Bharuch,<br />
Dibyapur,<br />
G<strong>and</strong>har, Gwalior,<br />
Hazira, Firozabad,<br />
Jamnagar,<br />
Jhabua, Kanpur,<br />
Khera, Lakwa,<br />
Rajahmundry,<br />
All other<br />
locations in BOM<br />
Deduction<br />
Factor (D)