j. Verify backup time on full load on the UPS<br />

4.0 PLACEMENT OF ORDER<br />

<strong>GAIL</strong> shall place the PO on the short listed Bidder. <strong>GAIL</strong> also reserves the right<br />

to reject any or all the bids without assigning any reason what so ever.<br />

After placing the FOI, the vendor shall submit the detailed Project Schedule to<br />

the Engineer-In-Charge stating the dates <strong>and</strong> activities planned including the<br />

details <strong>of</strong> the engineers that will be deployed for the <strong>installation</strong> <strong>and</strong><br />

configuration <strong>of</strong> the PCs <strong>and</strong> associated peripherals.<br />

5.0 SITE READINESS<br />

5.1 Site Preparation<br />

The site for <strong>installation</strong> <strong>of</strong> the equipment/materials shall be provided by<br />

<strong>GAIL</strong> for the <strong>installation</strong> <strong>of</strong> equipments along with the power supply up<br />

to the point <strong>of</strong> UPS (Indian style 5 AMP power socket will be provided).<br />

5.2 Inspection/Acceptance Testing<br />

QAPLUS tests shall be run for CPU, RAM, hard disk, floppy drive <strong>and</strong><br />

result should confirm to the Diagnostic report, submitted by the Bidder.<br />

5.3 Acceptance Test at <strong>GAIL</strong> Offices<br />

On completion <strong>of</strong> <strong>installation</strong> <strong>of</strong> the equipment but before<br />

<strong>commissioning</strong> by the SUPPLIER, each item <strong>of</strong> the equipment shall be<br />

physically inspected on-site jointly by <strong>GAIL</strong> <strong>and</strong> Bidder for the<br />

correctness <strong>and</strong> the completeness <strong>of</strong> the <strong>installation</strong> <strong>and</strong> acceptability<br />

for start-up.<br />

The acceptance test, which involves the operation <strong>of</strong> the complete<br />

system, will be conducted by the Bidder in the presence <strong>of</strong> the <strong>GAIL</strong><br />

representative. The system will be accepted subject to the compliance<br />

<strong>of</strong> the tests to the satisfaction <strong>of</strong> <strong>GAIL</strong>.<br />

In case <strong>of</strong> failures, the acceptance tests will be restarted provided the<br />

maximum number <strong>of</strong> restarts shall not exceed two in number. System<br />

failing in final acceptance test is likely to be rejected <strong>and</strong> would require<br />

replacement immediately.<br />

In case the vendor found to be supply the items not as per the quoted<br />

specifications, EIC has a right to reject the material at site(s) <strong>and</strong><br />

vendor shall be responsible for replacement <strong>of</strong> the same without any<br />

cost <strong>and</strong> time implications. The final payment for the same shall be<br />

released after resolution <strong>of</strong> all identified problems.<br />