04.08.2013 Views

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

Supply, installation, testing and commissioning of pcs and ... - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.0 SCOPE OF WORK<br />

<strong>GAIL</strong> intends to procure the IT assets on outright purchase basis. The technical<br />

details <strong>of</strong> the items are mentioned in the Annexure “Technical<br />

Specifications” <strong>and</strong> the detailed Bill <strong>of</strong> Material is attached in Annexure “Bill<br />

<strong>of</strong> Material”.<br />

The scope shall cover <strong>Supply</strong>, Installation, Testing <strong>and</strong> Commissioning<br />

<strong>of</strong> various IT assets across <strong>GAIL</strong> locations identified in this document.<br />

The Bidder’s responsibility shall specifically include but not limited to the<br />

following:<br />

3.1.1 <strong>Supply</strong>, Installation <strong>and</strong> Commissioning <strong>of</strong> Windows XP based PC with<br />

associated Hardware & S<strong>of</strong>tware as detailed in TECHNICAL<br />

SPECIFICATIONS.<br />

3.1.2 Installation <strong>of</strong> operating system <strong>and</strong> configuration <strong>of</strong> Office automation<br />

applications.<br />

3.1.3 The successful Bidder shall configure the <strong>of</strong>fered PCs for connecting them<br />

into LAN when it is in place at each site. They should also configure the<br />

DMI S/W features for controlling <strong>and</strong> Managing <strong>of</strong> PCs from Management<br />

node. The required I/Os <strong>and</strong> the mounting cords (patch cords) shall be<br />

provided by <strong>GAIL</strong>.<br />

3.1.4 All the data <strong>and</strong> programs installed in the old PC shall be re-installed <strong>and</strong><br />

copied on to the new PCs <strong>and</strong> make the desktop ready to use to the<br />

employee.<br />

3.1.5 Supplier shall install the mounting rails <strong>and</strong> install the projector on the<br />

ceiling. Any incidental civil / architectural works involved during<br />

<strong>installation</strong> shall be to supplier’s account. The supplier shall restore the<br />

damaged civil / architectural, if any works back to its original condition.<br />

Cables - A set <strong>of</strong> power / signal cables shall be supplied with each<br />

projector<br />

The main signal cable <strong>of</strong> appropriate length shall be connected from the<br />

<strong>of</strong>fered projector to an Extension box where the shorter length signal<br />

cable shall be connected from the various input sources like PC /<br />

Notebook PC etc. The Supplier shall supply 2 nos. <strong>of</strong> the shorter signal<br />

cables with each projector to connect the PCs etc. with the extension box<br />

in addition to the longer signal cable connected from the projector to the<br />

extension box.<br />

3.1.6 <strong>GAIL</strong> has got the licenses <strong>and</strong> media for the Symantec Antivirus 9.0 for<br />

Windows OS based systems. To install <strong>and</strong> configure the same to get the<br />

automatic updates from the centralized servers in all the supplied PCs<br />

<strong>and</strong> carry out all necessary configuration for virus detection, protection<br />

<strong>and</strong> deletion <strong>of</strong> the virus is under the scope <strong>of</strong> the vendor.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!