The Bidder shall be responsible for h<strong>and</strong>ing over all the licenses <strong>and</strong><br />

filling the registration form <strong>of</strong> the supplied s<strong>of</strong>tware with their<br />

principals.<br />

6.0 SUPPLY CONDITION<br />

All equipment <strong>and</strong> sub equipment (sub system) supplied <strong>and</strong> installed at the<br />

stipulated locations shall be NEW <strong>and</strong> respective OEM make <strong>and</strong> conforming to<br />

the contract technical specifications. End-<strong>of</strong>-Life (EOL), End-<strong>of</strong>-Support (EOS)<br />

<strong>and</strong> near EOL or near EOS products shall not be quoted by the bidder. The<br />

certificate <strong>of</strong> newness is to be furnished.<br />

The Bidder shall ensure that no other equipment/structure/setup gets<br />

damaged due to their activities. Any damages if caused to <strong>GAIL</strong>’s property<br />

due to Bidder’s negligence shall be passed on the Bidder’s account.<br />

7.0 DELIVERY<br />

• Bidder shall make operational all the systems in 12 weeks from date <strong>of</strong> Fax<br />

<strong>of</strong> Intent.<br />

• Zero date for the Warranty will start only after successful completion <strong>of</strong><br />

work at all locations <strong>and</strong> signing <strong>of</strong> Acceptance Protocol by bidder’s<br />

representative <strong>and</strong> EIC.<br />

8.0 INSTALLATION<br />

All the pre-requisites regarding site readiness has to be clearly intimated to<br />

<strong>GAIL</strong> in advance <strong>and</strong> if felt needed, Bidder can visit the SITE(S) in advance <strong>and</strong><br />

check for the readiness for power, housing, <strong>installation</strong>/operation etc. <strong>of</strong> the<br />

SYSTEM(S) at SITE(S). Bidder shall make recommendations on any <strong>of</strong> the<br />

parameters in case the same is not found in acceptable range, before the supply<br />

<strong>of</strong> the items.<br />

Installation responsibilities<br />

On completion <strong>of</strong> placement, Bidder shall get the Bill <strong>of</strong> Material checked <strong>and</strong><br />

signed by <strong>GAIL</strong>’s site IT-Coordinator, carry out the <strong>installation</strong>, <strong>and</strong> show the<br />

SYSTEM(S) in working order to <strong>GAIL</strong>’s site IT-Coordinator at SITE(S). The<br />

Bidder shall configure the SYSTEM(S) as per the detailed discussions held at<br />

SITE with <strong>GAIL</strong> Team.<br />

Prime responsibility <strong>of</strong> the Bidder will remain for items <strong>and</strong> associated s<strong>of</strong>tware’s<br />

placed by the Bidder, Operating systems <strong>and</strong> any required OS Patch <strong>and</strong> utility<br />

during the first time <strong>installation</strong>.<br />

On successful completion <strong>of</strong> the Installation <strong>and</strong> proper tuning (virtual memory<br />

etc.) <strong>of</strong> the SYSTEM(S), these shall be h<strong>and</strong>ed over to <strong>GAIL</strong>. SUPPLER shall<br />

submit the <strong>installation</strong> report along with SYSTEM(S) configuration report, results<br />

<strong>of</strong> diagnostic tests run etc. to <strong>GAIL</strong>.<br />

Installation report has to be submitted by the vendor mentioning all the serial<br />

nos. (Monitor, CPU, Keyboard, Mouse, UPS etc. against the user) <strong>of</strong> the