5.2.1 Northern Access Road (NAR)<br />

<strong>BAE</strong> <strong>SYSTEMS</strong> <strong>PLC</strong><br />

<strong>ROF</strong> <strong>BISHOPTON</strong><br />

<strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong><br />

24 th October 2010<br />

A further construction access point will be established from October 2011 to<br />

facilitate access to the Northern Access Road site only.<br />

Only the main contractor for the Northern Access Road works and the<br />

emergency services attending this site will be afforded use of this access point<br />

and it will only be available from the west via Junction 31 of the M8. No access<br />

to the A8 East of the site entrance will be available and signage will be placed<br />

to advise this.<br />

Emergency Service vehicles will not be excluded from Bishopton village<br />

This access point and compound will provide small office accommodation,<br />

welfare facilities, off-road / on-site parking and wheelwash facilities.<br />

This access is required to avoid NAR Construction Vehicles transiting the<br />

remediation zones within the main site.<br />

On completion of this section of road, permanent public access will be<br />

available though this access, however, this will only service new housing<br />

developments, which will be subject to a further <strong>Plan</strong>ning Consent.<br />

5.2.2 Southern Access Road (SAR)<br />

A final additional access point will be established from November 2011 on the<br />

A8 east of Bishopton Village solely to provide construction access to the new<br />

Southern Access Road.<br />

No construction vehicle access to the A8 West of the site entrance will be<br />

available and signage will be placed to advise accordingly.<br />

This site access is necessary to deal with the dissection of the SAR site by the<br />

existing railway. It will service compound facilities for construction of the<br />

carriageway north of the new rail bridge and the construction of the new rail<br />

bridge itself (SAR North Sector) Compound facilities for the southern portion of<br />

this new access road (SAR South Sector) will be accessed via Georgetown<br />

Reception Centre.<br />

It is noted that due to the form of bridge construction, large level areas are<br />

desired to act as a crane platforms for lifting of 50m span steel members.<br />

The area adjacent the A8 and the proposed SAR North Sector compound<br />

affords this more readily and provides more suitable access for vehicles<br />

delivering long span steel members.<br />

Once the rail bridge has been completed then the SAR North Sector can be<br />

down graded to a satellite welfare facility only, with primary access to this site<br />

only available via Georgetown Reception Centre.<br />

As the road will generally be constructed from the new roundabout at the A8<br />

southwards, downgrading of this compound is a logical step.<br />

GARDINER & THEOBALD LLP 13