21/09/2010<br />

<strong>ROF</strong> Bishopton Master Development Programme (Revision F)<br />

<strong>BAE</strong> Systems Plc<br />

Line Name Duration Start End<br />

215<br />

216<br />

217<br />

218 Road Design / Approvals<br />

219 Conceptual / Preliminary Design<br />

220<br />

221<br />

222 Road Strategy<br />

223<br />

224<br />

225 Detailed Design<br />

226<br />

227<br />

228<br />

229<br />

230<br />

231<br />

232<br />

233<br />

234<br />

235<br />

236<br />

237 Roads Construction Consent (RCC)<br />

238<br />

239<br />

240<br />

241<br />

242<br />

243<br />

244<br />

245<br />

246<br />

247<br />

248 Main Pumping Station (From WAF)<br />

249<br />

250<br />

251<br />

252<br />

253<br />

254<br />

255<br />

256<br />

257<br />

258<br />

259<br />

260<br />

261 Tender<br />

262 Prepare Contract Documents<br />

263<br />

264<br />

265 Specification<br />

266<br />

267<br />

Sub Structure<br />

Erection Temporary Works<br />

Issue Check Certificates<br />

Roundabout<br />

Southern Access Road<br />

Discussion with Renfrewshire Council<br />

Agreement of Road Strategy with Renfrewshire Council<br />

Roundabout at A8<br />

Geometry and Layout<br />

Road Lighting<br />

Drainage Proposals<br />

Southern Access Road<br />

Horizontal and Vertical Alignment<br />

Road Lighting<br />

Road Drainage<br />

Embankment /Earthworks Design<br />

Geotechnical Design<br />

Drawings<br />

Development of RCC Documents<br />

A8 Roundabout<br />

Southern Access Road<br />

Approval Period<br />

Submit RCC<br />

RCC review by Renfrewshire Council<br />

Target Date for RCC Approval<br />

Road Safety Audits<br />

Stage 1<br />

Stage 2<br />

Confirm SW requirements - initial discussions with SW<br />

Design Pumping Station<br />

Size Rising Mains<br />

Size Pumps<br />

Design Pump Chamber<br />

Design Temporary Storage Chamber<br />

Connection to Existing Sewers<br />

Submission for Technical Approval<br />

Prepare Submissions<br />

Issue Submissions to SW<br />

Review by SW<br />

Receive Approval from SW<br />

Connection Application<br />

Confirm Standard Form of Contract and <strong>BAE</strong> Special Requirements<br />

Conditions of Contract<br />

Bridge<br />

Road<br />

25d 10/01/2011 11/02/2011<br />

20d 07/02/2011 04/03/2011<br />

07/03/2011 07/03/2011<br />

350d 29/03/2010 29/08/2011<br />

56d 29/03/2010 21/06/2010<br />

10d 08/06/2010 21/06/2010<br />

10d 29/03/2010 16/04/2010<br />

10d 22/06/2010 06/07/2010<br />

10d 22/06/2010 05/07/2010<br />

06/07/2010 06/07/2010<br />

154d 06/07/2010 18/02/2011<br />

45d 06/07/2010 06/09/2010<br />

30d 06/07/2010 16/08/2010<br />

15d 17/08/2010 06/09/2010<br />

15d 17/08/2010 06/09/2010<br />

30d 10/01/2011 18/02/2011<br />

20d 10/01/2011 04/02/2011<br />

10d 07/02/2011 18/02/2011<br />

10d 07/02/2011 18/02/2011<br />

53d 19/07/2010 29/09/2010<br />

35d 19/07/2010 03/09/2010<br />

30d 19/08/2010 29/09/2010<br />

165d 03/01/2011 29/08/2011<br />

20d 03/01/2011 28/01/2011<br />

4w 03/01/2011 28/01/2011<br />

4w 03/01/2011 28/01/2011<br />

120d 07/03/2011 29/08/2011<br />

07/03/2011 07/03/2011<br />

24w 07/03/2011 26/08/2011<br />

29/08/2011 29/08/2011<br />

40d 03/01/2011 25/02/2011<br />

5d 03/01/2011 07/01/2011<br />

5d 21/02/2011 25/02/2011<br />

105d 29/03/2010 30/08/2010<br />

30d 29/03/2010 14/05/2010<br />

5d 17/05/2010 21/05/2010<br />

5d 24/05/2010 28/05/2010<br />

10d 31/05/2010 11/06/2010<br />

10d 14/06/2010 25/06/2010<br />

5d 28/06/2010 02/07/2010<br />

40d 05/07/2010 30/08/2010<br />

10d 05/07/2010 16/07/2010<br />

19/07/2010 19/07/2010<br />

30d 19/07/2010 27/08/2010<br />

30/08/2010 30/08/2010<br />

30/08/2010 30/08/2010<br />

170d 07/03/2011 07/11/2011<br />

10d 07/03/2011 18/03/2011<br />

07/03/2011 07/03/2011<br />

10d 07/03/2011 18/03/2011<br />

30d 07/03/2011 15/04/2011<br />

20d 07/03/2011 01/04/2011<br />

20d 07/03/2011 01/04/2011 267<br />

I:\PWRPROJ\Projects\GTMS_P~1\<strong>BAE</strong> Systems Bishopton\REVISION F\<strong>BAE</strong> <strong>ROF</strong> Rev F.pp<br />

2010 2011 2012 13 14 15 16<br />

F A J A O D F A J A O D F A J A O D<br />

-7 1 9 17 25 33 41 49 57 65 73 81 89 97 105 113 121 129 137<br />

>><br />

150 214 278<br />

218<br />

219<br />

221<br />

248<br />

249<br />

250<br />

220<br />

251<br />

252<br />

222<br />

223<br />

224<br />

253<br />

225<br />

226<br />

227<br />

254<br />

234<br />

235<br />

255<br />

256<br />

257<br />

258<br />

228<br />

229<br />

236<br />

259<br />

260<br />

215<br />

230<br />

231<br />

237<br />

238<br />

239<br />

240<br />

245<br />

246<br />

216<br />

217<br />

232<br />

233<br />

241<br />

242<br />

243<br />

247<br />

261<br />

262<br />

263<br />

264<br />

265<br />

266<br />

244<br />

Revision F

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!