14.08.2013 Views

BAE SYSTEMS PLC ROF BISHOPTON Traffic Management Plan

BAE SYSTEMS PLC ROF BISHOPTON Traffic Management Plan

BAE SYSTEMS PLC ROF BISHOPTON Traffic Management Plan

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>BAE</strong> <strong>SYSTEMS</strong> <strong>PLC</strong><br />

<strong>ROF</strong> <strong>BISHOPTON</strong><br />

<strong>Traffic</strong> <strong>Management</strong> <strong>Plan</strong><br />

24 th October 2010<br />

facilities and welfare facilities dating back to initial operations at Georgetown<br />

which commenced in 1915, involving shell filling during the great war, until<br />

1919. Subsequently, in 1940 operations recommenced in 3 new factories to<br />

manufacture propellant for the British Army and Royal Air force – The factory<br />

was finally closed in 2000, however an operational Environmental Test Facility<br />

(ETF) remains on site and will remain operational for the foreseeable future.<br />

The ETF is outwith the scope of this document and will be isolated from the<br />

main site by way of security fencing and utility service alterations and<br />

diversions.<br />

The <strong>ROF</strong> Bishopton Site remains an explosives Licensed Site under license<br />

from the Health & Safety Executive, however, the boundary of that license will<br />

be revised over time to reflect completion of remediation works and handover<br />

of each area to developers.<br />

As all factory sites are now redundant, <strong>BAE</strong> Systems Plc have undertaken to<br />

carry out a programme of remediation and infrastructure works to prepare<br />

elements of the site for sale to housing and commercial developers which<br />

includes the provision of community facilities. Of the 1000ha within the site<br />

ownership boundary approximately 230ha will be developed as a Core<br />

Development Area (CDA) with the remainder converted to Woodland Park for<br />

public use. Remediation standards will reflect the future proposed uses of the<br />

site. A Masterplan drawing is included within Appendix A.<br />

Structures on site are of varying vintage and are currently disused. With no<br />

practical current use they are therefore largely surplus to requirements<br />

<strong>BAE</strong> Systems will continue to operate commercially the ETF situated at the<br />

southeast corner of the site and occupying approximately 170 hectares of<br />

land. This facility employs around 40 permanent staff. Access to and from the<br />

facility is to be maintained throughout the redevelopment of the rest of the<br />

<strong>ROF</strong> site.<br />