<strong>University</strong> <strong>of</strong> <strong>Florida</strong> BIM Guidelines and Standards<br />

All design modeling will be performed utilizing Autodesk "Revit" s<strong>of</strong>tware platforms<br />

(Architecture, Structure, MEP), versions 2011 or later. The design team shall collectively<br />

coordinate platform versioning for compatibility purposes during the design process. Any<br />

deviations shall require approval from the Owner.<br />

At each design phase, the model maturity shall be developed to the extent that it will<br />

generate the drawing document deliverables with the content, level <strong>of</strong> detail, and format as<br />

required by the <strong>UF</strong> Design Services & Commissioning Guide and shall be consistent with<br />

level <strong>of</strong> development as described by phase below. The resulting output, depicted in<br />

traditional two-dimensional drawing format with drawing sheets organized by discipline,<br />

dimensioned and detailed, shall serve as validation <strong>of</strong> the accuracy and completeness<br />

contained within the building information model(s).<br />

In general, the Design Team shall follow the <strong>UF</strong> Design Services & Commissioning Guide<br />

for each design phase, however, the Design Team shall not be required to create additional<br />

drawings, models, etc. that may be indicated in these guidelines when deemed unnecessary<br />

for construction purposes, or to the BIM Model.<br />

It is understood that not all project designs will require the same phases and durations.<br />

Adjustments to the model(s) level <strong>of</strong> development and phase durations will be agreed upon<br />

as necessary by the project team (for example; a small minor project may only require a<br />

50% and 100%CD review, whereas a larger scale minor project may require conceptual,<br />

advanced Schematic, design development, 60% CD, and 100% CD review phases).<br />

1.9.3.3. Area Calculations - <strong>UF</strong> Design Services Guide Requirements<br />

1.9.3.3.1. Purpose and Scope<br />

For <strong>UF</strong> minor projects resulting in new buildings, additions to existing, otherwise the<br />

creation <strong>of</strong> new square footage, at the end <strong>of</strong> each design phase, the Design Pr<strong>of</strong>essional<br />

shall calculate the area <strong>of</strong> the project using the following method and compare this<br />

information to the owner’s requirements as outlined in a space summary form or <strong>Facilities</strong><br />

Program template document. Area calculations may be obtained utilizing Autodesk Revit<br />

S<strong>of</strong>tware;<br />

1. Building Gross Square Feet: Determine the total building gross square feet by adding<br />

the sum <strong>of</strong> the floor areas <strong>of</strong> the building included within the outside faces <strong>of</strong> exterior<br />

walls for all stories, or areas that have floor surfaces. Gross area should be computed<br />

by measuring from the outside face <strong>of</strong> exterior walls, disregarding cornices, pilasters,<br />

buttresses, etc., which extend beyond the wall face. Gross area should include<br />

basements (except unexcavated portions), attics, garages, enclosed porches, penthouses,<br />

mechanical equipment floors, lobbies, mezzanines, all balconies (inside and outside)<br />

utilized for operational functions, and corridors, provided they are within the outside<br />

face lines <strong>of</strong> the building. Stairways, elevator shafts, mechanical service shafts, and<br />

ducts are to be counted as gross area on each floor through which the shaft passes.<br />

Exclude open courts and light wells, portions <strong>of</strong> upper floors eliminated by rooms or<br />

lobbies that rise above single floor height, and non-enclosed covered walkways.<br />

BIM Execution Plan- <strong>UF</strong> Minor Projects Template <strong>UF</strong>-000 16 <strong>of</strong> 20 pages