Untitled - UF-Facilities Planning & Construction - University of Florida
Untitled - UF-Facilities Planning & Construction - University of Florida
Untitled - UF-Facilities Planning & Construction - University of Florida
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>University</strong> <strong>of</strong> <strong>Florida</strong> BIM Guidelines and Standards<br />
1.2. Addendum to <strong>UF</strong> Contracts<br />
This Guide is incorporated by reference into the <strong>UF</strong> minor projects annual contracts consisting <strong>of</strong> the<br />
Agreement between Owner and Pr<strong>of</strong>essional and Agreement for <strong>Construction</strong> Management Services.<br />
1.2.1. Agreement Between Owner and Pr<strong>of</strong>essional for Minor Projects Continuing<br />
Pr<strong>of</strong>essional Services<br />
(Reference “Exhibit A” 2.1.3 / 2.8.17 <strong>UF</strong> contract for specific language)<br />
1.2.2. Agreement for <strong>Construction</strong> Management Services<br />
1.3. Methodology<br />
(Reference “Exhibit A” 8.9 <strong>UF</strong> contract for specific language)<br />
<strong>University</strong> <strong>of</strong> <strong>Florida</strong> Minor projects encompass a wide range <strong>of</strong> scale and complexity, with total<br />
construction costs up to $2 million. Such variation necessitates a flexible approach to the process <strong>of</strong> BIM<br />
execution for minor projects. The document body <strong>of</strong> the annual contracts is relatively fixed, therefore<br />
language within the project specific contract exhibits, and accompanying BIM Execution Plan shall provide<br />
the necessary guidance for each project. This BIM Execution Plan template shall be tailored project specific<br />
and authored by the owner’s PM, Design team, and CM team representatives. Each <strong>UF</strong> division utilizing<br />
the minor projects annual contract, (Housing/IFAS/PPD/FPC) will determine the extent <strong>of</strong> BIM<br />
execution for individual projects within their respective areas. The scope <strong>of</strong> this BIM execution plan is<br />
intended to include new construction, renovation, remodeling, and building utility type projects.<br />
Relative to BIM model level <strong>of</strong> development protocols, it is recognized that design firms may have existing<br />
measures in place that efficiently utilize one or the other within its internal workflows.<br />
AIA E202 BIM Protocol<br />
<strong>UF</strong> LOD Table (.xls)<br />
1.4. Project Overview / General Information<br />
Project Name: Albert W Gator Building, <strong>UF</strong>-000<br />
Project Address: <strong>UF</strong> Main Campus<br />
Brief Project Description<br />
BIM Execution Plan- <strong>UF</strong> Minor Projects Template <strong>UF</strong>-000 4 <strong>of</strong> 20 pages