27.08.2013 Views

Untitled - UF-Facilities Planning & Construction - University of Florida

Untitled - UF-Facilities Planning & Construction - University of Florida

Untitled - UF-Facilities Planning & Construction - University of Florida

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>University</strong> <strong>of</strong> <strong>Florida</strong> BIM Guidelines and Standards<br />

1.10. Coordination Guidelines<br />

1.10.1. General<br />

2. Net Assignable Square Feet: Determine the sum <strong>of</strong> room areas excluding nonassignable<br />

areas. Room area is defined as the net area <strong>of</strong> the room in square feet,<br />

measured between the inside surfaces <strong>of</strong> walls and partitions. Non-assignable areas<br />

include interior circulation space (including stairs), custodial areas, mechanical areas,<br />

structural areas, public rest rooms, exterior circulation space (including stairs),<br />

elevators, and telephone/data communication equipment areas.<br />

3. Non-Assignable Square Feet: Determine the net room area <strong>of</strong> all non-assignable spaces<br />

as defined in Item 2 above.<br />

4. Covered Walkway Gross Square Feet: Measure floor area, excluding any areas which<br />

were included in Building Gross Square Feet calculations.<br />

5. Impervious Surface Gross Square Feet: Measure impervious surfaces created as part <strong>of</strong><br />

the project site plan including sidewalks, service drives, parking, plazas, etc. that are not<br />

covered in Paragraph 3 above.<br />

BIM Coordination guidelines shall be established by the Contractor for the purpose <strong>of</strong><br />

supplementing the coordination process between trades and design disciplines.<br />

1.10.2. File Format Compatibility<br />

All coordination drawings shall be produced in file formats compatible with other coordination<br />

team members. All <strong>Construction</strong> Documents shall be generated from the BIM model(s). BIM<br />

Model coordination and clash detection will be performed utilizing the BIM Model and AutoDesk<br />

Revit/Navisworks s<strong>of</strong>tware platforms.<br />

1.10.3. Constructability Reviews<br />

The BIM model shall be utilized for the purpose <strong>of</strong> constructability reviews. Use <strong>of</strong> the BIM<br />

Model for constructability review shall not be considered as in kind replacement for reviewing the<br />

traditional printed 2D line drawing documents but as a supplementary effort to improve the<br />

review process. Constructability reviews shall be accomplished as follows:<br />

An analysis and evaluation <strong>of</strong> the constructability <strong>of</strong> the design concepts, narratives, or drawings.<br />

An analysis and evaluation <strong>of</strong> the design concepts, narratives, or drawings in regard to the<br />

completeness <strong>of</strong> intended bid categories, conflicts or overlaps in the divisions <strong>of</strong> the work.<br />

BIM Execution Plan- <strong>UF</strong> Minor Projects Template <strong>UF</strong>-000 17 <strong>of</strong> 20 pages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!