<strong>University</strong> <strong>of</strong> <strong>Florida</strong> BIM Guidelines and Standards<br />

1.7.1. Collaboration Meetings<br />

There will be different types <strong>of</strong> Collaboration meetings needed for the project, including general<br />

progress meetings, design coordination meetings, etc. In the space below, list the types <strong>of</strong> meetings<br />

necessary for the project, meeting host(s), required attendees, and required technology. (Sample text in<br />

red below)<br />

Meeting Type Host Required Attendees Required<br />

Technology<br />

Design Meetings<br />

Architect / Design Team Revit Architecture,<br />

BIM Model<br />

Design<br />

Revit Structure, Revit<br />

Progress/Coordination Disciplines<br />

MEP, Projector,<br />

Laptop PC<br />

Design Presentations Owner / User Owner, Design Team, Revit Architecture,<br />

BIM Model Presentations to Group<br />

CM, Team, User Group Revit Structure, Revit<br />

Project Team<br />

MEP, Projector,<br />

Laptop PC<br />

Design Team Coordination Architect / Design Team Revit Architecture,<br />

BIM Model<br />

Design<br />

Revit Structure, Revit<br />

Coordination/Clash Detection Disciplines<br />

MEP, Navisworks,<br />

Projector, Laptop PC<br />

CM Team Coordination <strong>Construction</strong> CM Team,<br />

Navisworks,<br />

BIM Model<br />

Manager<br />

Subcontractors, Owner, Projector, Laptop PC<br />

Coordination/Clash Detection<br />

Design Team<br />

CM As-Built Coordination Architect / CM Team,<br />

Revit Architecture,<br />

As-Built BIM Model<br />

<strong>Construction</strong> Subcontractors, Owner, Revit Structure, Revit<br />

Progress/Coordination Manager<br />

Design Team<br />

MEP, Navisworks,<br />

Projector, Laptop PC<br />

1.7.1.1. Project Specific Sustainability Goals and LEED Certification Documentation<br />

The project may have certain LEED EB requirements. <strong>UF</strong> project manager shall notify project<br />

team <strong>of</strong> any requirements.<br />

1.7.1.2. Sustainable Design Tools and Execution<br />

When the scale <strong>of</strong> the project is applicable, the Design Team may employ a variety <strong>of</strong> BIM s<strong>of</strong>tware for<br />

sustainable design including the ones identified in the analysis Model Matrix. The model analysis done<br />

in BIM sustainability s<strong>of</strong>tware such as, but not limited to, Autodesk® Ecotect®, 3ds Max Design, Revit<br />

MEP, and IES may be utilized to analyze the design model for potential issues that may improve,<br />

correct, or optimize the design models <strong>of</strong> various design disciplines.<br />

BIM Execution Plan- <strong>UF</strong> Minor Projects Template <strong>UF</strong>-000 9 <strong>of</strong> 20 pages