Eaton E Series DX Product Manual - Fusion Power System
Eaton E Series DX Product Manual - Fusion Power System
Eaton E Series DX Product Manual - Fusion Power System
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
User Guide UPS 20 - 40 kVA, 380/400/415V, 50/60 Hz<br />
(3-phase input/3-phase output)<br />
614-06749-03 Revision 03<br />
1.<br />
2.<br />
3.<br />
4.<br />
Safety instructions….....……………………………………………………....……….. 01<br />
1.1 Safety caution….....………………….....………………….....…………………..... 01<br />
1.2 Audience caution….....………………….....………………….....………………01<br />
1.3 CE marking….....………………….....………………….....………………….....…02<br />
1.4 User precaution….....………………….....………………….....………………02<br />
1.5 Environment….....………………….....………………….....…………………..... 03<br />
1.6 Inquiries….....………………….....………………….....………………….....……03<br />
Introduction..........................................…………………………….....………………04<br />
2.1 <strong>System</strong> description….....………………….....………………….....………………04<br />
2.2 Basic system configuration….....………………….....………………….....……05<br />
2.3 Panel figure….....………………….....………………….....………………….....…05<br />
2.4 Exterior figure….....………………….....………………….....…………………..... 06<br />
Technical data…………………………………………….……………….....…………09<br />
3.1 Standards…………………………………………………………………………09<br />
3.2 Environment………………………………………………………………………09<br />
3.3 Dimensional drawings……………………………………………………………09<br />
3.4 Characteristics……………………………………………………………………10<br />
3.5 AC input……………………………………………………………………………10<br />
3.6 DC circuit……………………………………………………………………………10<br />
3.7 AC output……………………………………………………………………………11<br />
Mechanical installation.….…....………………………………………………………12<br />
4.1 Delivery check………………………………………………………………………12<br />
4.2 Unpacking and visual inspection………………………………………………12<br />
4.3 Planning before installation………………………………………………………14<br />
4.4 Cabinet installation………………………………………………………………15<br />
4.5 Maintenance Bypass Switch (MBS) operation…………………………………15