MUNZSSInlD - usaid
MUNZSSInlD - usaid
MUNZSSInlD - usaid
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UNCLAS SECTION 02 OF 03 GUATEMALA 04138<br />
PT EXITOS; (4) PROPOSE AND DISCUSS POTENTIAL MITIGATIVE<br />
P.EASURES WITH THE PP TEAM, INCLUDING COST ESTIMATES;<br />
(5) PROPOSE AND DISCUSS ALTERNATIVE MONITORING<br />
MECHANISMS, INCLUDING COST ESTIMATES; AND (6) PREPARE<br />
AN 1A CChSlSAINI? WITE lEE PROVISIONS OF 22 CYR<br />
A MINI'UM,<br />
216. AT<br />
THE EA WILL INCLUDE AN EXECUTIVE SUMMARY<br />
PROVIDING MAJOR CONCLUSIONS; A PURPOSE SECTION; A<br />
SECTION ON ALTERVATIVES, INCLUDING THE PROPOSED<br />
(I.1.,<br />
ACTION<br />
THE PROJECT AS DESIGNED); A SECTION ON THE<br />
ENVIRONMENT LIKELY TO BE AFFECTED; A SECTION DISCUSSING<br />
REASONABIY FORSEEABLE PROJECT IMPACTS;<br />
MONITORING;<br />
A SECTION<br />
A<br />
ON<br />
SECTION ON MITIGATION ALTERNATIVES; AND A<br />
CONCLUSIONS SECTION.<br />
- SPECIFIC TO THE ISSUE 07 PESTICIDE USAGE, THE<br />
INVIRONINTFAL ASSISSMENT WILL REVIEW TEE PESTICIDE<br />
PANACFMENT CAPAPILITIES OF NATIONAL AND REGIONAL<br />
INSTITUTIONS; ASSESS THEIR REACH IN LIGHT OF THE DEMAND<br />
FO SERVICES; AND RECOMMEND THE BEST AND MOST<br />
APPROPRIATE MYCEANISMS TO ENSURE THAT A PROJECT<br />
REFERRAL SYSTEM FOR GROWERS/EXPORTERS WITH PESTICIDE<br />
PPOBLEMS IS ESTABLISHED DURING PROJECT IMPLEMENTATION.<br />
- SPECIFIC TO THE ISSUE OF NATURAL RESOURCE<br />
CONFLICTS, IT WILL BE IMPOSSIBLE TO ASSESS SPECIFIC<br />
CCNFI.ICTS PRIOR TC PROJECT IMPLEMENTATION. THIS IS<br />
PECAUSI TEE NATURF OF THE CONFLICTS WILL VARY ACCORDING<br />
TO TEE TYPE OF AGRICULTURAL/INDUSTRIAL INTERVENTION<br />
SUPPORTED BY THE PROJECT; TEE CHARACTERISTICS OF THE-<br />
INDIVIDUAL OPERATION AND SITE; INTERVENTION TIMING;<br />
A<br />
AND<br />
MYRIAD OF OTHER FACTORS. THE EA WILL THEREFORE<br />
CONCENTRATE (1) ON IDENTIFYING REASONABLY FORSEABLE<br />
TYPES OF IMPACTS TEAT MAY OCCUR AS A RESULT OF<br />
PROJECT-SPECIFIC PROVISION OF TECHNICAL ASSISTANCE;<br />
(2)<br />
AND<br />
ON RECOMMENDING APPROPRIATE MECHAIISMS TO ADDRESS<br />
CONFLICTS AS THEIT ARISE--ON A CASE-BY-CASE<br />
EASIS--DURING PROJECT IMPLEMENTATION. (ROCAP INTENDS<br />
TO ADDRESS THE BROADER ISSUE OF THE IMPACT OF CONTINUED<br />
NTA EXPORT INCREASES ON NATURAL RESOURCES IN CENTRAL<br />
AMERICA AS A SEPARATELY FUNDED ACTIVITY IN FT'92-93.)<br />
- SPECIFIC TO THE ISSUE OF LIGHT INDUSTRIAL<br />
PCLLUTION AND WhSTE DISPOSAL, THE NATURE 0 IMPACT WILL<br />
ALSO BE HIGHLY CASE-SPECIFIC-DIPENDIUG 01 TIE TTPE,<br />
SIZE •<br />
AND NATURE O THE INDUSTRIAL ACTIVITY, AND UPON<br />
THE NATURE OF THE TECHNICAL ASSISTANCE PROVIDED<br />
TERETO. THE NA WILL THEREFORE CONCENTRATI ON (1)<br />
IDENTIFYING REASONABLY FORMEABLE TYPES 01 IMPACTS<br />
PAY<br />
THAT<br />
OCCUR AS A RESULT OF PROJECT-SPECIFIC PROVISION OF<br />
TECHNICAL ASSISTANCE (ESPECIALLY TO MANUSACTURINO AND<br />
PROCESSING ACTIVITIES); AND (2) ON RECOMMINDINO<br />
APPROPRIATE MECHANISMS TO ADDRESS CASE-BY-CASE<br />
CONILICTS AS THEY ARISE DURING IMPLEMENTATION.<br />
- II THE CASI OF ALL THREE ISSUES SCOPID FOR THIS<br />
2/3<br />
UNCLASSIFIED<br />
GUATEMALA *04138/92