Strategic Facility Planning Guide<br />

Fiscal Years 2013-14, 2014-15, 2015-16<br />

Kenosha, Racine and Walworth Counties<br />

FACILITY PLANNING<br />

FY 2013-14<br />

Location<br />

Page 5 of 18<br />

Estimated Costs<br />

Building Expansion<br />

Academic Building Expansion Kenosha $1,500,000<br />

Remodeling<br />

$1,500,000<br />

South Building – Rehab & Expansion Elkhorn $1,500,000<br />

Learning Success Center Remodel Kenosha 1,500,000<br />

Demonstration Kitchen – Lake Building Lower Level Racine 300,000<br />

Restroom Renovation – South Building Elkhorn 150,000<br />

Restroom Renovation – Academic Building North Kenosha 150,000<br />

$3,600,000<br />

Repairs<br />

Boiler Replacement – Racine Campus Racine $1,500,000<br />

HVAC Replacement – South Building Elkhorn 400,000<br />

Electrical Service Replacement – South Building Elkhorn 250,000<br />

Every Child’s Place Storm Water Control Kenosha 250,000<br />

Electrical Substation – <strong>Technical</strong> Building Racine 200,000<br />

Roof Replacement – South Building Elkhorn 150,000<br />

Parking Lot – Existing iMET Parking Lot Sturtevant 110,000<br />

Parking Lot Repair – Grounds Kenosha 100,000<br />

Exterior Lighting Repairs Kenosha 100,000<br />

Horizon Center Auto Shop Floor Kenosha 100,000<br />

Site Repairs Elkhorn 80,000<br />

AHU Retrofit – Racine Building Racine 60,000<br />

Lighting Upgrade – iMET Original High Bay and Lobby Sturtevant 50,000<br />

Clerestory Masonry Wall – South Building Elkhorn 40,000<br />

Corridor Window Replacement Kenosha 40,000<br />

Science Labs Improvements – <strong>Technical</strong> Building Racine 30,000<br />

Exterior Sealant – Lake Building Racine 25,000<br />

Every Child’s Place Fence Kenosha 25,000<br />

Lincoln Building 3 rd Floor and Stairwell Repair Racine 20,000<br />

IT Closet Air Conditioning – Racine Building R209 Racine 20,000<br />

Every Child’s Place – Toilet Installation Kenosha 15,000<br />

Signage – Visix Upgrade Racine 10,000<br />

$ 3,575,000<br />

Total Fiscal Year 2014 Projects for Consideration $ 8,675,000<br />