04.01.2014 Views

Regular Meeting - Gateway Technical College

Regular Meeting - Gateway Technical College

Regular Meeting - Gateway Technical College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 13 of 18<br />

Strategic Facility Planning Guide<br />

Fiscal Years 2013-14, 2014-15, 2015-16<br />

Kenosha, Racine and Walworth Counties<br />

SECTION 3 - THREE-YEAR PROJECT SUMMARY<br />

Fiscal Year 2013-14<br />

EXPANSION<br />

Description Location Need<br />

Academic Building<br />

Expansion<br />

Academic Building<br />

Kenosha Campus<br />

Approximately 7000 sq. ft. addition to<br />

the existing building<br />

Estimated<br />

Budget<br />

$1,500.00<br />

REMODELING<br />

Description Location Need<br />

Rehab and Expansion<br />

Learning Success<br />

Center Remodel<br />

Demonstration Kitchen<br />

Restroom Renovation<br />

Restroom Renovation<br />

REPAIRS<br />

South Building<br />

Elkhorn Campus<br />

Academic Building<br />

Kenosha Campus<br />

Lake Building<br />

Racine Campus<br />

South Building<br />

Elkhorn Campus<br />

Academic Building<br />

Kenosha Campus<br />

Remodel existing South Building and<br />

small expansion of footprint<br />

Remodel space to support tutoring and<br />

other student academic support activities<br />

Remodel former bookstore space to<br />

support the Culinary Arts program.<br />

Estimated<br />

Budget<br />

$1,500,000<br />

1,500,000<br />

300,000<br />

Remodel Restrooms 150,000<br />

Refurbish out-of-date restroom to<br />

improve appearance and functionality<br />

150,000<br />

Description Location Need<br />

Estimated<br />

Budget<br />

Boiler Replacement Racine Campus Improve efficiency and energy savings $1,500,000<br />

HVAC Replacement<br />

South Building<br />

Elkhorn Campus<br />

Replace equipment that is at end of life. 400,000<br />

Electrical Service South Building<br />

Upgrade aging equipment 250,000<br />

Replacement<br />

Elkhorn Campus<br />

Every Child’s Place Bioscience Building Re-grade and provide additional catch<br />

Storm Water Control Kenosha Campus basins<br />

250,000<br />

Electrical Substation<br />

<strong>Technical</strong> Building<br />

Racine Campus<br />

Replace aging equipment 200,000<br />

Roof Replacement<br />

South Building<br />

Elkhorn Campus<br />

Repair and replace roof 150,000<br />

Parking Lot iMET – Sturtevant Resurface deteriorating parking lot. 110,000<br />

Parking Lot Repair<br />

Grounds<br />

Kenosha Campus<br />

Repair and resurface parking lots 100,000<br />

Exterior Lighting<br />

Repairs<br />

Auto Shop Floor<br />

Kenosha Campus<br />

Horizon Center<br />

Kenosha Campus<br />

Address Deficiencies – Improve and<br />

increase safety and security<br />

100,000<br />

Refinish auto shop floor 100,000<br />

June 20, 2013<br />

75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!