Strategic Facility Planning Guide<br />

Fiscal Years 2013-14, 2014-15, 2015-16<br />

Kenosha, Racine and Walworth Counties<br />

FACILITY PLANNING<br />

FY 2015-16<br />

Location Estimated Costs<br />

Expansion<br />

Corridor Expansion – Racine Building 2 nd Floor Racine $ 1,000,000<br />

Parking Lot A Expansion – Racine Building Racine 500,000<br />

1,500,000<br />

Remodeling<br />

<strong>Technical</strong> Building 3 rd Floor Improvements Racine 750,000<br />

Lake Building 2 nd Floor Upgrades Racine 500,000<br />

Restroom Refurbishment – 2 nd Floor – Academic Building Racine 120,000<br />

1,370,000<br />

Repairs<br />

Fire Sprinkler System – Lake, <strong>Technical</strong> & Lincoln Buildings Racine 1,500,000<br />

Chiller Replacement – North Building Elkhorn 700,000<br />

AHU Replacement – Lake Building 2 nd Floor Racine 300,000<br />

Sewer Separation – Lake Building to Lincoln Building Racine 300,000<br />

High Roof – Conference Center Kenosha 220,000<br />

West Parking Lot Kenosha 200,000<br />

Doors/Frames Stripping & Painting – Campus Wide Racine 200,000<br />

Corridor Flooring Upgrade – Racine Building 2 nd Floor Racine 200,000<br />

Solar Hot Water Racine 200,000<br />

Electrical Panel Boards – <strong>Technical</strong> Building Racine 190,000<br />

SR 142 Intersection Burlington 150,000<br />

Elevator Upgrade – Racine Building Racine 150,000<br />

Electrical Panel Boards – Lake Building Racine 150,000<br />

Electrical Substation – Lincoln Building Racine 100,000<br />

Clocks Wireless System – Campus Wide Racine 100,000<br />

Exterior Sealant – Lincoln Building Racine 100,000<br />

Exterior Wall Repair – Lake Building Service Lot Racine 100,000<br />

Corridor Flooring Upgrade – Lincoln Building Lower Level Racine 100,000<br />

Hybrid Charging Stations – Racine and iMET<br />

Racine/<br />

Sturtevant<br />

100,000<br />

Carpet – LRC Kenosha 75,000<br />

Service Lot – West Wall – Lake Building Racine 50,000<br />

Fire Alarm Upgrades Kenosha 50,000<br />

Exterior Lighting (Remainder of Campus) Kenosha 50,000<br />

Surveillance System Upgrade – Racine and iMET<br />

Racine/<br />

Sturtevant<br />

50,000<br />

Landscape Project – Campus Kenosha 25,000<br />

June 20, 2013<br />