Page 8 of 18<br />
Strategic Facility Planning Guide<br />
Fiscal Years 2013-14, 2014-15, 2015-16<br />
Kenosha, Racine and Walworth Counties<br />
FACILITY PLANNING<br />
FY 2015-16<br />
Location Estimated Costs<br />
Expansion<br />
Corridor Expansion – Racine Building 2 nd Floor Racine $ 1,000,000<br />
Parking Lot A Expansion – Racine Building Racine 500,000<br />
1,500,000<br />
Remodeling<br />
<strong>Technical</strong> Building 3 rd Floor Improvements Racine 750,000<br />
Lake Building 2 nd Floor Upgrades Racine 500,000<br />
Restroom Refurbishment – 2 nd Floor – Academic Building Racine 120,000<br />
1,370,000<br />
Repairs<br />
Fire Sprinkler System – Lake, <strong>Technical</strong> & Lincoln Buildings Racine 1,500,000<br />
Chiller Replacement – North Building Elkhorn 700,000<br />
AHU Replacement – Lake Building 2 nd Floor Racine 300,000<br />
Sewer Separation – Lake Building to Lincoln Building Racine 300,000<br />
High Roof – Conference Center Kenosha 220,000<br />
West Parking Lot Kenosha 200,000<br />
Doors/Frames Stripping & Painting – Campus Wide Racine 200,000<br />
Corridor Flooring Upgrade – Racine Building 2 nd Floor Racine 200,000<br />
Solar Hot Water Racine 200,000<br />
Electrical Panel Boards – <strong>Technical</strong> Building Racine 190,000<br />
SR 142 Intersection Burlington 150,000<br />
Elevator Upgrade – Racine Building Racine 150,000<br />
Electrical Panel Boards – Lake Building Racine 150,000<br />
Electrical Substation – Lincoln Building Racine 100,000<br />
Clocks Wireless System – Campus Wide Racine 100,000<br />
Exterior Sealant – Lincoln Building Racine 100,000<br />
Exterior Wall Repair – Lake Building Service Lot Racine 100,000<br />
Corridor Flooring Upgrade – Lincoln Building Lower Level Racine 100,000<br />
Hybrid Charging Stations – Racine and iMET<br />
Racine/<br />
Sturtevant<br />
100,000<br />
Carpet – LRC Kenosha 75,000<br />
Service Lot – West Wall – Lake Building Racine 50,000<br />
Fire Alarm Upgrades Kenosha 50,000<br />
Exterior Lighting (Remainder of Campus) Kenosha 50,000<br />
Surveillance System Upgrade – Racine and iMET<br />
Racine/<br />
Sturtevant<br />
50,000<br />
Landscape Project – Campus Kenosha 25,000<br />
June 20, 2013<br />
70