Strategic Facility Planning Guide<br />
Fiscal Years 2013-14, 2014-15, 2015-16<br />
Kenosha, Racine and Walworth Counties<br />
Page 18 of 18<br />
Description Location Need<br />
Estimated<br />
Budget<br />
Solar Hot Water Racine Campus Improve energy savings. 200,000<br />
Electrical Panel<br />
Boards<br />
Elevator Upgrade<br />
Electrical Panel<br />
Boards<br />
SR 142 Intersection<br />
Electrical Substation<br />
Clocks Wireless<br />
System<br />
Exterior Sealant<br />
Exterior Wall Repair<br />
Corridor Flooring<br />
Upgrade<br />
Hybrid Charging<br />
Station<br />
Carpet<br />
Service Lot West Wall<br />
Fire Alarm Upgrade<br />
Exterior Lighting<br />
(Remainder of<br />
Campus)<br />
Surveillance System<br />
Upgrade<br />
<strong>Technical</strong> Building<br />
Racine Campus<br />
Racine Building<br />
Racine Campus<br />
Lake Building<br />
Racine Campus<br />
Burlington Center<br />
Lincoln Building<br />
Racine Campus<br />
Replace aging equipment 190,000<br />
Upgrade / repair and improve<br />
appearance of interior.<br />
150,000<br />
Replace aging equipment. 150,000<br />
Share of cost to install intersection at<br />
old 142 and McCanna<br />
150,000<br />
Replace aging equipment. 100,000<br />
Racine Campus Update clock system 100,000<br />
Lincoln Building<br />
Racine Campus<br />
Lake Building<br />
Service Lot<br />
Racine Campus<br />
Lincoln Building<br />
Racine Campus<br />
iMET – Sturtevant &<br />
Racine Campus<br />
LRC<br />
Kenosha Campus<br />
Lake Building<br />
Racine Campus<br />
Kenosha Campus<br />
Kenosha Campus<br />
Replace deteriorating sealant on<br />
windows.<br />
100,000<br />
Repair deteriorating wall. 100,000<br />
Upgrade to improve appearance. 100,000<br />
Improve Services 100,000<br />
Improve interior appearance 75,000<br />
Repair deteriorating wall 50,000<br />
Upgrade fire alarms / improve quality<br />
of safety<br />
Improve safety / security and increase<br />
energy savings<br />
50,000<br />
50,000<br />
iMET – Sturtevant & Improve and increase safety and<br />
Racine Campus security<br />
50,000<br />
Landscape Project Kenosha Campus Improve exterior appearance 25,000<br />
Network Closet HVAC Kenosha Campus Improve climate control 25,000<br />
Painting<br />
<strong>Technical</strong> Building<br />
Racine Campus<br />
Improve Appearance 20,000<br />
Painting<br />
Racine Building<br />
Racine Campus<br />
Improve Appearance 20,000<br />
Annual Repairs<br />
Burlington Center<br />
Improve efficiency, energy savings<br />
and appearance<br />
10,000<br />
June 20, 2013<br />
80