Regular Meeting - Gateway Technical College
Regular Meeting - Gateway Technical College
Regular Meeting - Gateway Technical College
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Strategic Facility Planning Guide<br />
Fiscal Years 2013-14, 2014-15, 2015-16<br />
Kenosha, Racine and Walworth Counties<br />
Page 14 of 18<br />
Description Location Need<br />
Estimated<br />
Budget<br />
Site Repairs Elkhorn Campus Parking lot and walkway repairs. 80,000<br />
AHU Retrofit<br />
Lighting Upgrade<br />
Clerestory Masonry<br />
Wall<br />
Corridor Window<br />
Replacement<br />
Science Lab<br />
Improvements<br />
Every Child’s Place<br />
Fence Installation<br />
Exterior Sealant<br />
Wall Repair<br />
IT Closet Air<br />
Conditioning R209<br />
Every Child’s Place<br />
Toilet Installation<br />
Signage-Visix<br />
Upgrade<br />
Racine Building<br />
Racine Campus<br />
iMET – Sturtevant<br />
South Building<br />
Elkhorn Campus<br />
Academic Building<br />
Kenosha Campus<br />
<strong>Technical</strong> Building<br />
Racine Campus<br />
Bioscience Building<br />
Kenosha Campus<br />
Lake Building<br />
Racine Campus<br />
Lincoln Building<br />
Racine Campus<br />
<strong>Technical</strong> Building<br />
Racine Campus<br />
Bioscience Building<br />
Kenosha Campus<br />
Racine Campus<br />
Improve efficiency and energy savings. 60,000<br />
Improve energy savings, maintenance<br />
savings, and appearance.<br />
50,000<br />
Improve appearance of exterior 40,000<br />
Replace single glazed windows with<br />
energy efficient type<br />
Reconfigure science labs to create a<br />
more student friendly environment.<br />
40,000<br />
30,000<br />
Install playground fence 25,000<br />
Replace deteriorating sealant on<br />
windows<br />
25,000<br />
Repair water damaged walls. 20,000<br />
Improve efficiency and energy savings 20,000<br />
Install child-size toilets 15,000<br />
Improve site identification / increase<br />
communication.<br />
10,000<br />
Fiscal Year 2014-2015<br />
FACILITY LEASE AGREEMENT<br />
Description Location Need<br />
Brookside Health<br />
Center<br />
Joint project<br />
w/Kenosha County<br />
Kenosha<br />
Partnership with Kenosha County in the<br />
development of a clinical laboratory site<br />
for health programs<br />
Estimated<br />
Budget<br />
$1,000,000<br />
EXPANSION<br />
Description Location Need<br />
Law Enforcement<br />
Academy Facility<br />
Front Foyer Entry<br />
Academic Building<br />
Kenosha Campus<br />
Conference Center<br />
Kenosha Campus<br />
Additional facility to support law<br />
enforcement academy<br />
Expand / replace entry to Conference<br />
Center<br />
Estimated<br />
Budget<br />
$1,000,000<br />
500,000<br />
June 20, 2013<br />
76