Strategic Facility Planning Guide<br />

Fiscal Years 2013-14, 2014-15, 2015-16<br />

Kenosha, Racine and Walworth Counties<br />

Page 7 of 18<br />

Location Estimated Costs<br />

Air Conditioning Upgrade – Lake Building 2 nd Floor Racine 100,000<br />

Replace Three (3) Original Rooftop Units – Hero Center Burlington 90,000<br />

AC Expansion – T115 – Academic Building Kenosha 90,000<br />

EOC Generator – Hero Center Burlington 80,000<br />

Lower Roof Replacement – Conference Center Kenosha 80,000<br />

Flooring – Bioscience Building Kenosha 75,000<br />

Fire Alarm Upgrades Kenosha 50,000<br />

Surveillance System Upgrade – Racine & iMET<br />

Racine/<br />

Sturtevant<br />

50,000<br />

Emergency Call Boxes (3 Total) – Racine & iMET<br />

Racine/<br />

Sturtevant<br />

35,000<br />

Signage Elkhorn 25,000<br />

Signage Racine 25,000<br />

Signage Kenosha 25,000<br />

Network Closet HVAC – Academic Building Kenosha 25,000<br />

Landscaping Project – Campus Wide Kenosha 25,000<br />

Annual Repairs – Center for Sustainable Living Kenosha 10,000<br />

$ 3,835,000<br />

Total Fiscal Year 2015 Projects for Consideration $12,315,000<br />

June 20, 2013<br />

69