Strategic Facility Planning Guide<br />
Fiscal Years 2013-14, 2014-15, 2015-16<br />
Kenosha, Racine and Walworth Counties<br />
Page 7 of 18<br />
Location Estimated Costs<br />
Air Conditioning Upgrade – Lake Building 2 nd Floor Racine 100,000<br />
Replace Three (3) Original Rooftop Units – Hero Center Burlington 90,000<br />
AC Expansion – T115 – Academic Building Kenosha 90,000<br />
EOC Generator – Hero Center Burlington 80,000<br />
Lower Roof Replacement – Conference Center Kenosha 80,000<br />
Flooring – Bioscience Building Kenosha 75,000<br />
Fire Alarm Upgrades Kenosha 50,000<br />
Surveillance System Upgrade – Racine & iMET<br />
Racine/<br />
Sturtevant<br />
50,000<br />
Emergency Call Boxes (3 Total) – Racine & iMET<br />
Racine/<br />
Sturtevant<br />
35,000<br />
Signage Elkhorn 25,000<br />
Signage Racine 25,000<br />
Signage Kenosha 25,000<br />
Network Closet HVAC – Academic Building Kenosha 25,000<br />
Landscaping Project – Campus Wide Kenosha 25,000<br />
Annual Repairs – Center for Sustainable Living Kenosha 10,000<br />
$ 3,835,000<br />
Total Fiscal Year 2015 Projects for Consideration $12,315,000<br />