FAULT FINDING CHART 5<br />

Does burner flame<br />

modulate ?<br />

No<br />

Yes<br />

Normal operation<br />

Release the hermetic chamber cover by removing<br />

two screws on both sides and by lifting them to<br />

release from their retaining hooks. ( Figure 26)<br />

RETAINING<br />

LUGS<br />

Chwck wiring from<br />

PCB to modulation<br />

coil on gas valve<br />

Yes<br />

Replace gas valve<br />

INNER<br />

CASING<br />

PANEL<br />

No<br />

Replace PCB<br />

Figure 26<br />

18. Routine Servicing<br />

VIEWING<br />

WINDOW<br />

22<br />

SERVICE PROCEDURE<br />

1. Remove the outer case as outlined in section“Replacing Components”<br />

2. Visually check all joints for gas/water tightness.<br />

3. Visually inspect the flue system.<br />

4. Check the condition of the seals around the combustion chamber.<br />

5. Check condition of electrodes and their location.<br />

6. Conduct a flue gas analysis of CO/CO2 ratio to confirm the combustion<br />

gas ratio is less that 0.004. If not check the combustion chamber and<br />

flue system for signs of leakage,damage or blockage. Remove any<br />

obstruction and clean as necessary. If clear check burner pressures,<br />

injectors or gas valve settings. Adjust and clean as necessary.<br />

18.1 To ensure the continued efficient and safe<br />

operation of the boiler it is recommended that it is<br />

checked and serviced regularly. The servicing must be<br />

carried out by a competent person in accordance with<br />

the Gas Safety (Installation and Use) Regulations. The<br />

frequency of servicing will depend upon the particular<br />

installation conditions and usage, but in all cases the<br />

boiler must be serviced at least once a year.<br />

18.2 Following servicing of the boiler the relevant<br />

sections of the 'Benchmark' Installation,<br />

Commissioning and Servicing Log Book must be<br />

completed.<br />

18.3 Prior to servicing a check of the flue operation<br />

and terminal guard (if fitted) along with a preliminary<br />

check of the boilers operation must be undertaken.<br />

18.4 Ensure the boiler is cold and that both the<br />

electrical and gas supplies to the boiler are isolated<br />

before commencing service of the boiler.<br />

18.5 Remove the boiler casing as follows:<br />

Open the front panel by removing two screws at<br />

the bottom of the boiler, Figure <strong>25</strong>.<br />

Release the side panels by removing the screws on<br />

the upper and lower sides (Figure 27 ). Remove the<br />

panels by swinging them out and lifting them up.<br />

Figure 27<br />

1<br />

2<br />

SECURING<br />

SCREWS<br />

(4 OFF)<br />

18.6 Remove the combustion chamber cover by<br />

removing four screws on sides. (Figure <strong>28</strong>)<br />

SECURING<br />

SCREWS (6 OFF)<br />

SECURING<br />

SCREWS<br />

SIDE PANELS<br />

Figure <strong>25</strong><br />

Figure <strong>28</strong><br />

SECURING<br />

SCREWS<br />

Page 22<br />

COMBUSTION<br />

CHAMBER<br />

COVER<br />

VIEWING<br />

WINDOW