28.02.2014 Views

Report PDF (3.7 MB) - USGS

Report PDF (3.7 MB) - USGS

Report PDF (3.7 MB) - USGS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Use of Surrogate Models To Estimate Suspended Sediment 25<br />

Table 4. Comparison of suspended sediment loads during selected storm events estimated using acoustic backscatter and sediment-transport curves based on<br />

2008–10 streamflows in the Clearwater River at Spalding, Idaho, and Snake River near Anatone, Washington.<br />

[Abbreviations: ABS corr<br />

, acoustic backscatter corrected for beam spreading and attenuation by water and sediment in decibels (dB); na, not applicable]<br />

Site<br />

Event<br />

No.<br />

Event dates<br />

Sediment load for ascending limb of hydrograph<br />

(tons)<br />

3-MHz_ABS corr<br />

or 1.5-<br />

MHz_ABS corr<br />

model<br />

2008–10<br />

sediment<br />

transport curve<br />

Percent<br />

difference<br />

Sediment load for descending limb of hydrograph<br />

(tons)<br />

3-MHz_ABScorr or<br />

1.5-MHz_ABS corr<br />

model<br />

2008–10<br />

sediment<br />

transport curve<br />

Percent<br />

difference<br />

Clearwater River na na – All 7 events combined 172,000 148,000 -15 131,000 178,000 30<br />

1 May 13–24, 2008 59,400 56,700 -5 13,000 18,800 36<br />

2 November 12–30, 2008 2,070 1,120 -60 3,750 2,850 -27<br />

3 January 1–12, 2009 2,950 790 -116 3,540 2,700 -27<br />

4 April 21–May 1, 2009 13,000 12,900 -1 17,700 24,600 33<br />

5 May 18–June 12, 2009 9,130 8,170 -11 51,100 62,600 20<br />

6 May 14–26, 2010 14,700 11,200 -27 7,370 10,200 32<br />

7 June 2–July 5, 2010 70,600 57,200 -21 34,900 56,000 46<br />

Snake River na na –All 6 events combined 585,000 409,000 -35 762,000 1,260,000 49<br />

1 April 18–May 3, 2009 122,000 68,500 -56 89,600 113,000 23<br />

2 May 5–11, 2009 48,600 39,400 -21 24,400 31,200 24<br />

3 May 18–24, 2009 98,400 84,100 -16 106,000 129,000 20<br />

4 April 20–27, 2010 15,700 11,300 -33 12,100 15,300 23<br />

5 May 16–30, 2010 33,000 26,600 -21 48,400 73,000 41<br />

6 June 2–19, 2010 267,000 180,000 -39 481,000 895,000 60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!