Sl Activity Deliverables<br />
11<br />
(c)<br />
(d)<br />
(e)<br />
Having analysed the various COTS<br />
products available in the market, carry out<br />
comparison of “Bespoke / „Ground Up‟<br />
development” (using the latest<br />
platforms/development tools available)<br />
vis-à-vis “COTS / Customisation” for<br />
implementing NAMS. Main factors to be<br />
considered: Ability to meet user<br />
requirements, time for „roll-out‟, Cost<br />
Benefit Analysis, Total Cost of<br />
Ownership, support from more than one<br />
vendor, change management, resource<br />
commitment, Cost etc.<br />
Suggest the Hardware architecture for<br />
NAMS.<br />
Study the existing ILMS (Air) system (its<br />
database, entity relationships, work-flow<br />
etc.) and advise the Navy on the<br />
methodology of interfacing ILMS (Air) to<br />
NAMS with a view to ensure that<br />
eventually, a SINGLE-system is available<br />
to the users for carrying out Operations,<br />
Maintenance and Logistics functions and<br />
maintenance / administration efforts are<br />
optimized<br />
(i) Comparison matrix “Bespoke /<br />
„Ground Up‟ development” vis-à-vis<br />
“COTS / Customisation” and firm<br />
recommendations regarding the<br />
approach best suited for the Navy‟s<br />
requirements.<br />
(ii) Potential benefits (tangible and<br />
intangible) as well as the ROI Navy<br />
would accrue by implementing NAMS.<br />
(ii) Time Lines for implementation of<br />
NAMS considering system design, data<br />
capture, training, testing, and<br />
implementation.<br />
Hardware architecture document<br />
ILMS (Air) migration plan document<br />
On completion of the phase I part payment will be released to the firm.<br />
Phase II (Preparation of Draft RFP) : (T1) + (Time for IN‟s approval for<br />
approach) + 60 days [= T2]<br />
(f) Market survey (through Expression of<br />
Interest/Request for <strong>Information</strong>) and<br />
identification of suitable vendors for the<br />
chosen approach (Bespoke or<br />
COTS/Customisation)<br />
(g) Finalise the NAMS implementation<br />
methodology: System design, method of<br />
data capture, type of training required,<br />
network architecture, testing / Proof of<br />
Concept, user acceptance, period of<br />
support etc.<br />
List of probable vendors with address,<br />
details of contact persons.<br />
NAMS Project Implementation Plan with<br />
time lines.<br />