GOVERNMENT OF INDIA - Information Resource & Facilitation ...
GOVERNMENT OF INDIA - Information Resource & Facilitation ...
GOVERNMENT OF INDIA - Information Resource & Facilitation ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5<br />
Part II – Essential Details of Items/Services required<br />
17. Schedule of Requirements. The details of the Services expected from the<br />
Consultant in assisting the Indian Navy is as follows:-<br />
Phase I (Decision regarding Approach)<br />
(a) Understand the processes and functions of various verticals of NAMS through<br />
assimilation of the User Requirement Specifications (URS) and Software / Systems<br />
Requirements Specifications (SRS) Documents, interaction with nominated officers<br />
and visits to essential location(s) if necessary and process / system studies.<br />
(b) Study the existing ILMS (Air) system (its database, entity relationships, workflow<br />
etc.) and advise the Navy on the methodology of interfacing ILMS (Air) to NAMS<br />
with a view to ensure that eventually, a SINGLE-system is available to the users for<br />
carrying out Operations, Maintenance and Logistics functions and maintenance /<br />
administration efforts are optimized. Director ILMS (Air) / Project Director NAMS at<br />
Kochi shall provide assistance for the same.<br />
(c) Carry out analysis of various COTS products (at least five products) available in<br />
the market wrt to their ability to meet the Navy‟s URS/SRS and carry out a GAP<br />
analysis.<br />
(d) Having analysed the various COTS products available in the market, carry out<br />
comparison of “Bespoke / „Ground Up‟ development” (using the latest<br />
platforms/development tools available) vis-à-vis “COTS / Customisation” for<br />
implementing NAMS. Main factors to be considered: Ability to meet user<br />
requirements, time for „roll-out‟, Cost Benefit Analysis, security aspects, Total Cost of<br />
Ownership, support from more than one vendor and Change Management.<br />
(e) Advise / assist the IN in finalisation of the NAMS solution considering the<br />
following aspects – approach to hardware and software selection, training for core<br />
team, design of the system, method of data capture to be followed, testing, roll-out<br />
strategy and plans, user acceptance test parameters and go-live parameters, enduser<br />
training and support.<br />
(f)<br />
Suggest the Hardware architecture for NAMS.<br />
Phase II (Preparation of Draft RFP)<br />
(g) Carry out market survey (through Expression of Interest/Request for<br />
<strong>Information</strong>) and identification of suitable vendors for the chosen approach (Bespoke<br />
or COTS/Customisation).<br />
(h) Prepare the analytical criteria / Qualitative Requirements (QRs) based on which<br />
effective selection of the NAMS platform and the vendor can be carried out.<br />
(j) Prepare draft RFP in the latest DPP / DPM format to include: the detailed<br />
implementation methodology, deliverables and timelines, vendor‟s qualifications /<br />
requirements expected, technical evaluation criteria for vendors, etc.<br />
Phase III (Placing of NAMS Order)<br />
(k) Scrutiny of the bids received in response to the RFP. Technical evaluation of<br />
the bids with respect to the criteria outlined in the RFP. Clarifications to be obtained<br />
Page 5 of 30