06.03.2014 Views

GOVERNMENT OF INDIA - Information Resource & Facilitation ...

GOVERNMENT OF INDIA - Information Resource & Facilitation ...

GOVERNMENT OF INDIA - Information Resource & Facilitation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5<br />

Part II – Essential Details of Items/Services required<br />

17. Schedule of Requirements. The details of the Services expected from the<br />

Consultant in assisting the Indian Navy is as follows:-<br />

Phase I (Decision regarding Approach)<br />

(a) Understand the processes and functions of various verticals of NAMS through<br />

assimilation of the User Requirement Specifications (URS) and Software / Systems<br />

Requirements Specifications (SRS) Documents, interaction with nominated officers<br />

and visits to essential location(s) if necessary and process / system studies.<br />

(b) Study the existing ILMS (Air) system (its database, entity relationships, workflow<br />

etc.) and advise the Navy on the methodology of interfacing ILMS (Air) to NAMS<br />

with a view to ensure that eventually, a SINGLE-system is available to the users for<br />

carrying out Operations, Maintenance and Logistics functions and maintenance /<br />

administration efforts are optimized. Director ILMS (Air) / Project Director NAMS at<br />

Kochi shall provide assistance for the same.<br />

(c) Carry out analysis of various COTS products (at least five products) available in<br />

the market wrt to their ability to meet the Navy‟s URS/SRS and carry out a GAP<br />

analysis.<br />

(d) Having analysed the various COTS products available in the market, carry out<br />

comparison of “Bespoke / „Ground Up‟ development” (using the latest<br />

platforms/development tools available) vis-à-vis “COTS / Customisation” for<br />

implementing NAMS. Main factors to be considered: Ability to meet user<br />

requirements, time for „roll-out‟, Cost Benefit Analysis, security aspects, Total Cost of<br />

Ownership, support from more than one vendor and Change Management.<br />

(e) Advise / assist the IN in finalisation of the NAMS solution considering the<br />

following aspects – approach to hardware and software selection, training for core<br />

team, design of the system, method of data capture to be followed, testing, roll-out<br />

strategy and plans, user acceptance test parameters and go-live parameters, enduser<br />

training and support.<br />

(f)<br />

Suggest the Hardware architecture for NAMS.<br />

Phase II (Preparation of Draft RFP)<br />

(g) Carry out market survey (through Expression of Interest/Request for<br />

<strong>Information</strong>) and identification of suitable vendors for the chosen approach (Bespoke<br />

or COTS/Customisation).<br />

(h) Prepare the analytical criteria / Qualitative Requirements (QRs) based on which<br />

effective selection of the NAMS platform and the vendor can be carried out.<br />

(j) Prepare draft RFP in the latest DPP / DPM format to include: the detailed<br />

implementation methodology, deliverables and timelines, vendor‟s qualifications /<br />

requirements expected, technical evaluation criteria for vendors, etc.<br />

Phase III (Placing of NAMS Order)<br />

(k) Scrutiny of the bids received in response to the RFP. Technical evaluation of<br />

the bids with respect to the criteria outlined in the RFP. Clarifications to be obtained<br />

Page 5 of 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!