Installing the Inverter<br />

Authorised electrician<br />

7.3.2.3 Recommended standard connection<br />

Equal MPP voltages must be applied to input 1 and 2, as well as inputs 3 and 4. The MPP voltages of the two DC<br />

paths can be different. They are tracked by separate, independently operating MPP trackers (MPP trackers A and B).<br />

(n 1<br />

=n 2<br />

, n 3<br />

=n 4<br />

).<br />

Electrical data for standard connection<br />

Connection of the DC inputs Number of modules per string n 1<br />

=n 2<br />

, n 3<br />

=n 4<br />

P max<br />

I max<br />

per string < 6 kW<br />

MPP trackers A+B together < 12 kW<br />

< 18.6 A per tracker<br />

MPP tracker A<br />

MPP tracker B<br />

U MPP<br />

= 350 - 800 V<br />

U MPP<br />

= 350 - 800 V<br />

n 1<br />

= n 2<br />

n 3<br />

= n 4<br />

Figure 8: Recommended standard connection<br />

7.3.2.4 Parallel input connection<br />

The DC inputs can also be connected in parallel. Only strings with identical MPP voltage can be connected in<br />

parallel (n 1<br />

=n 2<br />

=n m<br />

).<br />

The maximum input current rises to 37.2 A for parallel connection.<br />

In case of a parallel input connection, MPP trackers A and B must be bridged. If input 1 is connected to input 2 and<br />

input 3 is connected to input 4, then there is no parallel operation and the maximum input current continues to be<br />

18.6 A. Parallel operation is automatically recognized by the inverter.<br />

Page 20 <strong>Installation</strong> <strong>Instructions</strong> blueplanet XP10U-H4