DSM Pocket Guidebook Volume 5: Renewable and Related ... - NREL
DSM Pocket Guidebook Volume 5: Renewable and Related ... - NREL
DSM Pocket Guidebook Volume 5: Renewable and Related ... - NREL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table R-8. Solar Thermal Parabolic Troughs: Costs<br />
Levelized Typical<br />
Capital Operational Cost of Size per Capadty<br />
System Cost1 Cost2 Eledridty3 lnstalation Factor Ufe<br />
Type ($/kW) ($/kWh) ($/kWh)<br />
(%) (yr)<br />
line-focus 3011 0.018 0.09-{).13 Up to 80 364 30<br />
Pombolic Trough<br />
to dote<br />
(MW)<br />
<br />
1. Keamey, D. et al., Status of Solar Electric Generating System (SEGS) Pkmts, 1991 Solar World Congress, Vol. 1, port 1, New York, Pergamon Press, August 1991.<br />
2. For on 8Q.MW SEGS plant, 40 technical ond operating personnel ore required plus 600 person-hours per week ore required for low-skill mirror washing <strong>and</strong> skilled system<br />
maintenance.<br />
3. The levelized energy costs (lE() vory depending on the assumptions used in the calculations. The low volue was token from Kearney, D. et al. lt is based on 1 990 dollars <strong>and</strong><br />
3[}year levelized costs, <strong>and</strong> colculoted on the basis of SEGS financing by private investor partnerships. Notional Renewob Energy lnboratory cakuted the LEC at $0.13.<br />
4. This value is bosed on the SEGS VIII plant. The plant generates power 8.64 hours per doy, of which sor mdioffon provides 75% of annual output.