01.05.2014 Views

CEMP - NZ Transport Agency

CEMP - NZ Transport Agency

CEMP - NZ Transport Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>NZ</strong> <strong>Transport</strong> <strong>Agency</strong><br />

CSM2 & MSRFL<br />

The draft Construction Environmental Management Plan (<strong>CEMP</strong>) has been produced in support of<br />

the Assessment of Environmental Effects (AEE) for the Main South Road Four Laning & Christchurch<br />

Southern Motorway Stage 2 Project. It is contained within volume 4 of the lodgement document,<br />

along with the Specialised Environmental Management Plans (SEMP) which are appendices to the<br />

<strong>CEMP</strong>.<br />

This document has been prepared to meet the <strong>NZ</strong>TA minimum requirements for a Contractors<br />

Social and Environmental Management Plan as per SM030 minimum standard z/4.<br />

The technical reports produced in support of the AEE form Volume 3 of the lodgement document.<br />

Cross-references to the relevant reports and the <strong>CEMP</strong> itself are provided in the AEE where<br />

appropriate. A full list of technical reports is shown in the table below, with links to the relevant<br />

sections of the AEE and to any applicable SEMP. For a full understanding of the Project all technical<br />

reports need to be read in full along with the AEE itself.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!