<strong>NZ</strong> <strong>Transport</strong> <strong>Agency</strong><br />

CSM2 & MSRFL<br />

<strong>CEMP</strong> Expectations for the appointed Principal Contractor<br />

The Principal Contractor shall develop, implement and maintain the environmental risk register<br />

throughout the duration of the CSM2 construction phase. A risk assessment procedure is required<br />

to be submitted to <strong>NZ</strong>TA to demonstrate that risks are being identified throughout the construction<br />

phase.<br />