CEMP - NZ Transport Agency
CEMP - NZ Transport Agency
CEMP - NZ Transport Agency
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>NZ</strong> <strong>Transport</strong> <strong>Agency</strong><br />
CSM2 & MSRFL<br />
<strong>CEMP</strong> Expectations for the appointed Principal Contractor<br />
The Principal Contractor shall develop, implement and maintain the environmental risk register<br />
throughout the duration of the CSM2 construction phase. A risk assessment procedure is required<br />
to be submitted to <strong>NZ</strong>TA to demonstrate that risks are being identified throughout the construction<br />
phase.<br />
Draft 40 <strong>CEMP</strong>