3. Part C - Implementation and Operation<br />
This section of the <strong>CEMP</strong> addresses the implementation and operation of the <strong>CEMP</strong> and the SEMPs.<br />
3.1 <strong>CEMP</strong> Management Structure and Responsibility<br />
The following areas are covered in this section:<br />
• <strong>CEMP</strong> Management Structure and Responsibility;<br />
• Training;<br />
• Operating Procedures inclusive of mitigation measures;<br />
• Emergency Contacts and Response; and<br />
• Feedback Management.<br />
3.1.1 <strong>CEMP</strong> Roles<br />
Table 3 outlines expected environmental anticipated management roles on site. Each contractor will<br />
likely have its own management structure and will need to provide a description of roles and<br />
responsibilities to <strong>NZ</strong>TA upon contract award.<br />
Table 3 Management roles and responsibilities<br />
Position Name Company Responsibility<br />
<strong>NZ</strong>TA Project<br />
Manager<br />
TBC <strong>NZ</strong>TA or delegate • Overall responsibility for the project<br />
Engineer to the<br />
Contract<br />
TBC Consultant • Overall responsibility for civil<br />
engineering/ construction activities<br />
• Responsibility for implementation of<br />
the <strong>CEMP</strong><br />
• Administration of the contract to<br />
<strong>NZ</strong>S 3910<br />
Principal Contractor<br />
Project Manager<br />
TBC TBC • Contractor representative with<br />
overall responsibility for the Project<br />
• Compliance and updating of the<br />
<strong>CEMP</strong><br />
• Successful delivery of the Project<br />