1. Part A – Background<br />
This draft Construction Environmental Management Plan (<strong>CEMP</strong>) details principles, practices and<br />
procedures to be implemented by the Christchurch Southern Motorway Stage 2 (CSM2) and Main<br />
South Road Four Laning (MSRFL). These principles, practices and procedures are intended to meet<br />
the conditions of resource consents and designations, other relevant legislation and the<br />
environmental objectives of the <strong>NZ</strong> <strong>Transport</strong> <strong>Agency</strong> (<strong>NZ</strong>TA).<br />
This <strong>CEMP</strong> has been prepared prior to the appointment of a Principal contractor. The Principal<br />
contractor will be required to produce its own Contractors Environmental Management Plan in<br />
accordance with the conditions of consent and <strong>NZ</strong>TAs requirements that will build upon and provide<br />
more detail to this <strong>CEMP</strong>.<br />
It should be noted that the requirements of this <strong>CEMP</strong> do not remove or overwrite the legal duties,<br />
responsibilities and obligations of the Principal Contractor and other parties in accordance with<br />
contract documents and legislation. If at any time the <strong>CEMP</strong> conflicts with the contractual and legal<br />
obligations for the project in general the Contractor will inform the Engineer to the contract at the<br />
earliest opportunity, highlighting the action or area of conflict. Legal obligations shall take<br />
precedence in any such instance. Contractual obligations should take precedence over <strong>CEMP</strong><br />
requirements until such time as the conflict is resolved.<br />
1.1 Scope and Application<br />
This <strong>CEMP</strong> is the umbrella document for environmental management of the construction phase of<br />
the CSM2 and MSRFL Project (the” Project”). It is supported by a range of Specialised Environmental<br />
Management Plans (SEMPs) which are attached as appendices to this <strong>CEMP</strong>.<br />
This <strong>CEMP</strong> will be reviewed after confirmation of the resource consent and designation conditions,<br />
and the document revised in accordance with these conditions. The <strong>CEMP</strong> and the SEMPs that are<br />
included within the Appendices of this <strong>CEMP</strong> should be updated, with the necessary certification,<br />
throughout the course of the Project to reflect material changes associated with changes to<br />
construction techniques or the physical environment.<br />
While all sections should be reviewed prior to implementation, sections to be completed or<br />
significantly updated prior to works commencement by the Principal contractor, are clearly labelled<br />
throughout this Draft <strong>CEMP</strong>. Where appropriate a section labelled “<strong>CEMP</strong> Expectations for the<br />
appointed Principal Contractor” will set out requirements.<br />
1.1.1 Purpose of the <strong>CEMP</strong><br />
The purpose of the <strong>CEMP</strong> is to:<br />
• Specify practicable methods and measures to avoid and mitigate adverse environmental<br />
effects arising from construction work.<br />
• Achieve compliance with environmental legislation;<br />
• Meet the expectations of <strong>NZ</strong>TA national policy for environmental protection;<br />
Draft 4 <strong>CEMP</strong>