<strong>NZ</strong> <strong>Transport</strong> <strong>Agency</strong><br />

CSM2 & MSRFL<br />

The final close out report will be signed off by the <strong>NZ</strong>TA Project Manager and Principal Contractor,<br />

all records and reports relating to the <strong>CEMP</strong> plus the close out report will be compiled by the CEM<br />

into a single final <strong>CEMP</strong> document. Copies of this final document will circulated as required and at<br />

the discretion of the <strong>NZ</strong>TA Project Manager. This report should be timed to coincide with the<br />

transition phase.<br />

<strong>CEMP</strong> Expectations for the appointed Principal Contractor<br />

The Principal Contractor shall submit to the <strong>NZ</strong>TA for agreement a review and reporting schedule<br />

that meets the requirements of the contract, any consent conditions and this <strong>CEMP</strong>.<br />

Draft 60 <strong>CEMP</strong>