05.05.2014 Views

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Request traffic modelling data and assumptions be subject to a peer review process.<br />

Suggest traffic studies compare the number of vehicles using the tunnel to the number of vehicles<br />

continuing to use aboveground routes.<br />

Request for traffic studies to be carried out along residential streets to determine potential traffic impacts.<br />

Suggest traffic studies include projected data for additional vehicles resulting from urban revitalisation<br />

and the construction of new residential apartments<br />

along Parramatta Road.<br />

Concern about the reliability of traffic data and<br />

projections because of recent overestimates of<br />

traffic projections for the Sydney Cross City<br />

Tunnel and Brisbane’s Clem 7 motorway.<br />

Clarify any proposed changes to existing traffic<br />

flows, in particular those changes which prioritise<br />

traffic using the tunnel.<br />

Concern that encouraging more cars onto toll<br />

roads does not address traffic congestion, instead<br />

it just moves the problem to another part of the<br />

road network.<br />

Homebush community information session<br />

Concern that building more roads just encourages more traffic onto the road network.<br />

Suggest the concept design avoid traffic light pinch points.<br />

Comment that removing the traffic lights and right turn on Homebush Bay Drive as a result of the new<br />

access ramp to the <strong>M4</strong> westbound will help ease traffic congestion.<br />

Concern increased westbound traffic during events at Olympic Park may cause congestion in the tunnel<br />

from traffic trying to access Homebush Bay Drive.<br />

Concern between the completion of <strong>M4</strong> Widening and <strong>M4</strong> <strong>East</strong> there will be increased traffic volumes on<br />

the <strong>M4</strong> but no additional road infrastructure east of Concord Road to cater for this additional traffic.<br />

Concern Concord Road will be transformed into a collector point for the tunnel, increasing traffic and<br />

congestion.<br />

Concern about increased traffic along Great North Road and Lyons Road from vehicles trying to avoid<br />

congestion on the City West Link and Parramatta Road.<br />

Comment that traffic exiting from the tunnel at Wattle Street, travelling along the City West Link, will need<br />

to pass through eight sets of traffic lights to reach Anzac Bridge.<br />

Suggest extending the tunnel to the disused rail yards at Catherine Street, Lilyfield to bypass four sets of<br />

traffic lights along the City West Link and avoid considerable traffic congestion.<br />

Concern about traffic congestion in the tunnel and along Wattle Street and Parramatta Road from traffic<br />

exiting the tunnel trying to join already congested roads.<br />

Question how traffic congestion will be managed between Stage 1 opening and Stage 3 completion<br />

along Parramatta Road near the tunnel exit heading east.<br />

20 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!