3.4.2 Funding and tolling<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Clarify what guarantees can be given that Stages 2 and 3 will go ahead.<br />
Clarify if NSW taxpayers will be forced to assume the financial burden of the project if tolling does not<br />
generate sufficient income to finance the project.<br />
Question what financial modelling has been carried out in relation to the route and the proposed toll?<br />
Suggest different toll scenarios be tested to determine the impact on surface traffic volumes.<br />
Comment that infrastructure projects of this size and nature be publicly funded from a combination of<br />
state and federal money without the need for any contribution from the road user.<br />
Request for details on the level of use required to generate sufficient tolling income to ensure project<br />
viability.<br />
Concern toll prices will discourage motorists from using the tunnel.<br />
Request toll points be located at the tunnel entrances and exits only and not on the <strong>M4</strong> Widening section<br />
as <strong>M4</strong> users have already paid a toll.<br />
Suggest toll points be set up along the <strong>M4</strong> now to help finance<br />
the project.<br />
Suggest toll charges be discounted for motorists who use the<br />
tunnel regularly or outside peak hours.<br />
Suggest toll charges vary depending on the type of vehicle eg<br />
motorbike toll charges be less than cars.<br />
3.4.3 Concept design<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Clarify what the maximum grades for tunnel entry/exit points.<br />
Question how deep the tunnel will be?<br />
Question what the maximum posted speed will be in the<br />
tunnels?<br />
Comment the tunnel be built with a minimum of three lanes in<br />
each direction.<br />
Clarify where the tunnel maintenance buildings and<br />
infrastructure will be located.<br />
Homebush community information session<br />
Question how four additional lanes under Concord Road bridge will be constructed under traffic?<br />
Concern the ramps proposed at the interchange of the existing <strong>M4</strong> and Concord Road do not appear to<br />
be an appropriate design and a more traditional interchange design to be considered.<br />
Request the number of traffic lanes on Parramatta Road remain as existing, as a minimum.<br />
Concern the eastbound tunnel exit near Rogers Avenue is located on high ground and will require traffic<br />
to travel along an upward incline to exit the tunnel which ignores lessons learnt from the M5 tunnel.<br />
3.4.4 Alternatives<br />
<br />
<br />
<br />
Question what is the justification for selecting a tunnel option over other alternatives?<br />
Comment there has not been adequate discussion on alternatives.<br />
Suggest alternative routes, designs and construction techniques be explored which may reduce property<br />
acquisition and impact on the local community.<br />
28 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>