05.05.2014 Views

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Suggest the commercial areas along Parramatta Road are more appropriate for the location of<br />

ventilation outlets, irrespective of any marginal decrease in efficiency.<br />

Request Ashfield Park and Yasmar are not considered as potential sites for a ventilation outlet.<br />

Concern similar problems experienced in relation to the M5 tunnel including in-tunnel ventilation, filtration<br />

systems and health issues will be experienced again.<br />

Suggest a smoky vehicle camera system be installed to detect, identify, record and fine owner /operators<br />

of heavy polluting vehicles.<br />

3.3.3 Health impacts<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Request for a health impact assessment to be undertaken.<br />

Question how the project will ensure air quality will not deteriorate near tunnel entry / exit points, access<br />

ramps and ventilation outlets and question how health risks will be monitored and addressed?<br />

Concern impact on air quality from the project may result in health issues for residents located near to<br />

tunnel entry/exit points, access ramps and ventilation outlets.<br />

Concern residents located close to construction activities will suffer<br />

adverse health effects due to increased noise, vibration, dust and<br />

exposure to asbestos.<br />

Concern about impact on residents’ health and safety as a result<br />

of increased traffic and pollution on local roads.<br />

Comment that local air quality may improve with smoother flowing<br />

traffic along Parramatta Road.<br />

Concern congestion in the tunnel from traffic trying to access City<br />

West Link and Parramatta Road will increase levels of pollution in<br />

and around the tunnel entry/exit points.<br />

Concern about the impact on property owners’ health due to the<br />

uncertainty of the location of project infrastructure, property<br />

acquisition and the stress of having to relocate.<br />

Question whether counselling will be provided to affected property<br />

owners?<br />

Concern a reduction in public open space areas such as Ashfield<br />

Park will have negative impacts on community health, cohesion<br />

and wellbeing.<br />

Update on air quality assessment<br />

Flemington Paddy’s Market community information session<br />

The NSW Government has appointed an expert Advisory Committee on Tunnel Air Quality to review<br />

current national and international best practice. Guidelines set by the Committee will be used by the<br />

project team to assist with the selection of ventilation outlet sites.<br />

The air quality monitoring program will be carried out during the current planning and assessment phase<br />

and when the motorway opens to traffic. Air quality specialists have recently been engaged to develop the<br />

monitoring program for the <strong>M4</strong> <strong>East</strong> and have commenced discussions with property owners to identify<br />

suitable locations for the monitoring stations. It is expected that these will be established and will be<br />

monitoring existing conditions by the middle of 2014.<br />

26 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!