4. Local feedback maps<br />

The majority of feedback received related to locations around tunnel entry and exit points, ramps and<br />

proposed road surface changes. The following three maps have been prepared summarising suggestions<br />

and concerns raised around these locations and include Homebush, Concord, Haberfield and Ashfield.<br />

The feedback raised relates to the WestConnex <strong>M4</strong> <strong>East</strong> November 2013 preliminary concept design. The<br />

motorway design team is considering this feedback to refine the design and to mitigate impacts where<br />

possible. More detailed information on the design will be available when the Environmental Impact<br />

Statement is displayed in late 2014.<br />

44 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>