M4_East_Feedback_Report_April14
M4_East_Feedback_Report_April14
M4_East_Feedback_Report_April14
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>M4</strong> <strong>East</strong> preliminary concept design – Concord feedback<br />
PARRAMATTA ROAD<br />
QUEEN STREET<br />
QUEEN LANE<br />
<strong>M4</strong> MOTORWAY<br />
PRINCESS AVENUE<br />
PRINCESS LANE<br />
CARRINGTON STREET<br />
CARRINGTON LANE<br />
COOPER STREET<br />
CONCORD ROAD CONCORD ROAD<br />
These comments are a summary of feedback received from members of the community on the November 2013 preliminary<br />
concept design. This feedback is currently being considered. More detailed information will be exhibited in the Environmental<br />
Impact Statement in late 2014 when further feedback will be sought.<br />
Property<br />
• Consider alternative designs to reduce property impacts<br />
• Consider different construction methods to reduce<br />
property impacts<br />
• Concern about property value impacts<br />
• Concern about difficulty in relocating in Concord<br />
after acquisition<br />
Traffic and transport<br />
• Request for traffic modelling data<br />
• Concern about traffic management during and<br />
after construction<br />
• Concern about increased truck movements locally<br />
• Request to minimise traffic impacts and maintain local<br />
road safety<br />
• Concern about access for emergency services<br />
• Request to maintain pedestrian and vehicle connections<br />
• Request to address construction worker parking<br />
Air quality, ventilation and health<br />
• Request for more information on the management of<br />
tunnel emissions<br />
• Request for the locations of ventilation outlets<br />
• Uncertainty of project impacts causing stress<br />
Concept design<br />
• Request for Concord Road interchange justification<br />
• Request to consider alternative designs to reduce impacts<br />
on homes and utilise existing vacant land<br />
• Request for more detailed plans and Concord 3D model<br />
• Request for tunnel entry/exit points to be closer to Burwood<br />
• Omission of streets in concept design (eg. Daly Avenue)<br />
Noise and vibration<br />
• Concern about noise increase from new road<br />
• Concern about construction noise including night works and<br />
vibration impacts<br />
• Request for noise modelling and monitoring<br />
• Request for property condition surveys before construction<br />
and guarantee compensation or damage repair<br />
Amenity<br />
• Concern about local amenity impacts<br />
• Concern about visual impacts from ramps and above<br />
ground infrastructure<br />
• Concern about loss of local street character from motorway<br />
and urban renewal<br />
• Concern about residual land development in local low<br />
density neighbourhoods after construction<br />
PRINCESS AVENUE<br />
PRINCESS LANE<br />
CONCORD BAPTIST CHURCH<br />
CONCORD<br />
BAPTIST CHURCH<br />
HILTS RD<br />
CARRINGTON STREET<br />
Request for landscaping<br />
and other treatments to<br />
minimise impacts of<br />
new access ramps on<br />
Sydney Street residents<br />
CONCORD LANE<br />
SYDNEY STREET<br />
PARRAMA TA ROAD<br />
CONCORD LANE<br />
CARRINGTON LANE<br />
SEE INSET MAP<br />
Concern about noise, dust,<br />
parking and access impacts<br />
during construction and operation<br />
LEICESTER AVENUE<br />
MANSON ROAD<br />
SYDNEY STREET<br />
SWAN AVENUE<br />
THORNLEIGH AVE<br />
KEPPEL AVENUE<br />
PATTERSON STREET<br />
STRATHFIELD<br />
SYDNEY STREET<br />
EDWARD STREET<br />
MOSELY STREET<br />
FRANKLYN ST<br />
PATTERSON STREET<br />
CONCORD ROAD<br />
Suggest the tunnel<br />
exit/entry ramps should<br />
surface on the western<br />
side of Concord Road<br />
SEE INSET MAP<br />
COOPER STREET<br />
DALY AVE<br />
ROBERTS STREET<br />
COWDERY LANE<br />
BELL STREET<br />
INVERARY ST<br />
EVERTON ROAD<br />
ALEXANDRA STREET<br />
LLOYD GEORGE AVE<br />
PHILIP STREET<br />
PATTERSON STREET<br />
Request for air quality<br />
monitoring and concern<br />
about health impacts around<br />
the tunnel entry/exit points<br />
COLES STREET<br />
ADA STREET ADA STREET<br />
Concern about increased traffic<br />
on Concord Road, Patterson<br />
Street and Gipps Street<br />
Concern about impact<br />
on heritage property<br />
THORNLEIGH AVENUE<br />
Concern about increased<br />
congestion caused by right<br />
hand turn<br />
EDWARD STREET<br />
GIPPS STREET<br />
LEIGH AVE<br />
WENTWORTH ROAD<br />
Concept design incorrectly labelled<br />
ramps over Concord Road<br />
Request to maintain pedestrian<br />
access to Concord Road including<br />
bus stops<br />
Request for<br />
entry/exit ramps to<br />
be shortened to<br />
minimise impacts<br />
on residents<br />
MELBOURNE STREET<br />
KEPPEL AVENUE<br />
EDWA<br />
<strong>M4</strong> MOTORWAY<br />
JOHN STREET<br />
GRANTHAM STREET<br />
Concern about visual and<br />
noise impacts from new<br />
road infrastructure<br />
Request to maintain safe<br />
and efficient pedestrian<br />
access to Strathfield Station<br />
for residents living north of<br />
Parramatta Road<br />
Concern about traffic<br />
congestion increase between<br />
<strong>M4</strong> Widening completion and<br />
<strong>M4</strong> <strong>East</strong> completion<br />
GODDARD<br />
PARK<br />
PARK AVENUE<br />
PARRAMATTA ROAD<br />
PARK ROAD<br />
ST MARY’S<br />
CATHOLIC<br />
PRIMARY<br />
SCHOOL<br />
FRANKLYN ST<br />
QUEEN<br />
ELIZABETH<br />
PARK<br />
PARRAMATTA ROAD<br />
BRITANNIA AVENUE<br />
BURWOOD<br />
PARK<br />
BROUGHTON STREET<br />
NEICH PARADE<br />
Clarification on the<br />
extent of cut and<br />
cover of ramps<br />
BROUGHTON STREET<br />
Maintain safe pedestrian and<br />
vehicle access to St Mary’s<br />
Catholic Primary School<br />
LANSDOWNE STREET<br />
DALY AVE<br />
BURTON STREET BURTON STREET<br />
BURWOOD ROAD<br />
ALEXANDRA<br />
Concern about construction impacts on residents<br />
including noise, dust, vibration and traffic<br />
Concern about<br />
safety of residents<br />
during construction<br />
BURWOOD ROAD<br />
GIPPS STREET<br />
ST LUKE’S<br />
ANGLICAN<br />
CHURCH<br />
LLOYD GEORGE AVE<br />
Concern over noise and<br />
access impacts on St Luke’s<br />
during construction<br />
Consider construction<br />
worker parking at back<br />
of Concord Oval<br />
LOFTUS STREET<br />
CONCORD<br />
OVAL<br />
PARRAMATTA ROAD<br />
SHAFTESBURY ROAD<br />
COLES STREET<br />
ADA STREET ADA STREET<br />
Concern about<br />
residents’ security<br />
in remaining properties<br />
Concern ramps will sever residents from<br />
local neighbourhood and community<br />
Health concerns for residents<br />
living near to construction site<br />
and tunnel entry/exit points<br />
Request for more information<br />
on length of access ramps<br />
and the depths of tunnels<br />
Concern about loss of<br />
on-street parking in local areas<br />
Request to maintain local<br />
vehicle access during<br />
and after construction<br />
Request for clarification on<br />
design of the tunnel exit<br />
KEY<br />
Opposed to the use of<br />
Concord Oval as a<br />
construction compound<br />
If used as a<br />
construction area:<br />
• impact from traffic<br />
noise and dust<br />
• loss of recreational<br />
facility<br />
• air quality concerns<br />
for residents<br />
New/upgraded surface road<br />
New tunnel<br />
Tunnel entry/exit<br />
Traffic flow<br />
Road<br />
Rail line<br />
TAYLOR S<br />
<strong>M4</strong> WESTERN MOTORWAY MOTORWAY<br />
Map and concept design are not to scale | April 2014