3.9 Construction<br />
Questions and concerns raised by the community included the proposed construction staging of all three<br />
phases of the WestConnex project, the length of construction, the procedures and regulations to be adopted<br />
during construction and the location of construction compounds. <strong>Feedback</strong> has been summarised under<br />
headings: staging and duration and construction compounds.<br />
3.9.1 Staging and duration<br />
Request for all three stages of the project to be built simultaneously.<br />
Request for Stage 3 to be constructed sooner to deal with potential traffic impacts in Haberfield /<br />
Ashfield.<br />
Question what is the planned duration of construction activities and how many hours/days per week will<br />
work be carried out?<br />
Question what procedures and regulations will be in place to manage construction activities?<br />
Construction fatigue is a concern raised particularly in relation to the scale and timeframes suggested for<br />
the project. Question what support systems will be available to residents during construction?<br />
Request for the tunnel at Underwood Road to be completed first allowing use of the tunnel to remove<br />
excess spoil directly onto the <strong>M4</strong>, minimising impacts on residents.<br />
Request for the construction of the <strong>M4</strong> Widening and <strong>M4</strong> <strong>East</strong> in the Homebush area to be aligned to<br />
minimise construction impacts on residents.<br />
3.9.2 Construction compounds<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Question where will the construction compounds/batching plants be located and how will construction<br />
vehicles access the construction sites from these facilities?<br />
Clarify how parking for construction workers will be managed.<br />
Concern that if Concord Oval is to be used as a construction staging area this will result in a loss of<br />
public amenity, introduce construction traffic to local residential streets and will increase dust and noise.<br />
Request for Concord Oval to not be used as a construction compound.<br />
Request for Ashfield Park, Hammond Park and/or Reg Coady Reserve to not be used as construction<br />
staging areas and alternative locations be considered.<br />
Concern that if Ashfield Park is to be used as a construction staging area this will result in a loss of<br />
public amenity, introduce construction traffic to local residential streets and will increase dust and noise.<br />
Request for parking in residential streets around construction sites to be limited to two hours except for<br />
residents.<br />
40 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>