05.05.2014 Views

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

M4_East_Feedback_Report_April14

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Suggest the urban revitalisation of Parramatta Road comprise of commercial premises eg cafes and<br />

open space for children to play with residential apartments above.<br />

Comment the images showing tree lined boulevards, coffee shops and cycle lanes along Parramatta<br />

Road are out of touch with reality. Concern about the architectural quality of future residential<br />

development.<br />

Suggest the property frontages along Parramatta Road be pushed back three metres to make room for<br />

dedicated bus lanes or light rail.<br />

Concern the urban revitalisation does not demonstrate provision for pedestrian and cycle use. Request<br />

for land use development to be integrated with active transport use.<br />

Concern constructing WestConnex alongside ‘urban activation’ will open up the Inner West to new<br />

threats of overdevelopment, with the precincts around major arterials such as Parramatta Road<br />

particularly affected.<br />

Question how WestConnex Delivery Authority proposes to relieve traffic congestion while planning to<br />

build high rise residential and commercial buildings along Parramatta Road?<br />

Question what assurances will be given that the current low density housing and local street character<br />

on the northern side of Parramatta Road up to Gipps Street and Patterson Street in Concord will be<br />

maintained?<br />

Concern that high rise construction is not in keeping with the historical architecture and heritage suburbs<br />

of the Inner West.<br />

Comment that the Yasmar site and the site of the Brescia building opposite offer a key urban<br />

revitalisation opportunity. The two sites could be linked to create a commercial and community precinct.<br />

Question does the $200 million set aside for urban revitalisation include the acquisition of properties<br />

along Parramatta Road?<br />

Request for all scenarios and supporting information prepared as part of the Integrated Land Use and<br />

Transport Structure Plan process be placed on public exhibition prior to finalisation of the plan.<br />

38 <strong>M4</strong> <strong>East</strong> Community <strong>Feedback</strong> <strong>Report</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!