11.05.2014 Views

Weeks Bay Watershed Project Management Plan - Mobile Bay ...

Weeks Bay Watershed Project Management Plan - Mobile Bay ...

Weeks Bay Watershed Project Management Plan - Mobile Bay ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

31<br />

The flood storage capacity lost from wetland alteration is believed to<br />

be significant.<br />

2. Rapid runoff of stormwater from impervious surfaces<br />

results in flooding, sedimentation, increased litter and<br />

contaminants.<br />

Stormwater run-off from impervious surfaces greatly increases the<br />

volume and rate of water discharge. Impacts downstream can be<br />

devastating. Flooding produced by Hurricane Danny in 1997 caused<br />

millions of dollars in damage in the Fish River <strong>Watershed</strong>.<br />

<strong>Watershed</strong>-wide efforts such as land protection and riparian<br />

vegetation restoration may help minimize such damage caused by<br />

rapid runoff in the future.<br />

<strong>Weeks</strong> <strong>Bay</strong> <strong>Watershed</strong> <strong>Management</strong> <strong>Plan</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!