High Capacity Transit System Plan - <strong>Final</strong> <strong>Report</strong> June 2009<br />

Refined Corridor Assessment<br />

Capital Costs<br />

The capital cost estimates are planning‐level estimates based on typical unit costs obtained from<br />

existing HCT services, planned HCT projects in other cities, and reports such as the Bus Rapid<br />

Transit Practitioner’s Guide (TCRP <strong>Report</strong> 118). The capital cost estimates include the following<br />

components:<br />

• Running Way. Running way costs include track, new pavement, power delivery system<br />

infrastructure, signing and striping, and TSP installations.<br />

• Stations. Station costs assume a unique shelter, benches, trash receptacles, bicycle racks,<br />

real‐time passenger information, and branding.<br />

• Vehicles. Vehicles are either streetcar cars, LRT cars, or standard‐length (40‐foot) stylized<br />

buses. Stylized buses typically look more streamlined and “rail car−like” than<br />

conventional buses, and they typically have advanced features such as Automated<br />

Passenger Counters (APC), TSP emitters, and on‐board real‐time passenger information<br />

displays.<br />

• Garage/Storage Facility. This cost is assumed for rail alternatives only. SunTran is currently<br />

constructing a bus garage/storage facility capable <strong>of</strong> accommodating articulated (60‐foot)<br />

buses used for BRT.<br />

• S<strong>of</strong>t Costs. S<strong>of</strong>t costs include design, engineering, and administration costs and<br />

contingencies.<br />

Figure 49 illustrates the scale <strong>of</strong> station that has been assumed in the capital costs assessment.<br />

These representative stations are designed for low‐floor boarding and include a unique shelter<br />

(designed with input from the community), lighting, a real‐time passenger information display,<br />

static information displays, a bicycle rack, benches, trash receptacles, and a unique route marker.<br />

The representative stations are built within existing ROW by converting existing on‐street<br />

parking to curb extensions (also called bus bulbs). The shelters are modular, so modules can be<br />

added or removed to reflect the volume <strong>of</strong> station users. One or more ticket vending machines<br />

may also be part <strong>of</strong> the station, along with features such as security cameras and emergency callboxes.<br />

Public art and landscaping opportunities would allow local neighborhood and business<br />

associations to customize the station to reflect the surrounding community. Similar stations have<br />

been constructed in Kansas City, MO, and the York Region <strong>of</strong> Ontario (near Toronto).<br />